Diagnostic analysis and protective measures of transient ground potential rise in a 1000 kv UHV substation
With the continuous expansion of power grid capacity and growth of voltage levels, the transient ground potential rise (GPR) caused by the switchgear operation has become great threaten to the safety of the grid. In the startup operation of 500 kV part of Taizhou 1000 kV ultra-high voltage (UHV) sub...