EXPLORING BIM FOR OPERATIONAL INTEGRATED ASSET MANAGEMENT – A PRELIMINARY STUDY UTILISING REAL-WORLD INFRASTRUCTURE DATA

The use of 3D information models within collaborative working environments and the practice of Building Information Modelling (BIM) are becoming more commonplace within infrastructure projects. Currently used predominantly during the design and construction phase, the use of BIM is capable in theo...

Full description

Bibliographic Details
Main Authors: G. A. Boyes, C. Ellul, D. Irwin
Format: Article
Language:English
Published: Copernicus Publications 2017-10-01
Series:ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences
Online Access:https://www.isprs-ann-photogramm-remote-sens-spatial-inf-sci.net/IV-4-W5/49/2017/isprs-annals-IV-4-W5-49-2017.pdf
id doaj-db2bbad16d8b42739718c5cb21dacc29
record_format Article
spelling doaj-db2bbad16d8b42739718c5cb21dacc292020-11-24T21:58:59ZengCopernicus PublicationsISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences2194-90422194-90502017-10-01IV-4-W5495610.5194/isprs-annals-IV-4-W5-49-2017EXPLORING BIM FOR OPERATIONAL INTEGRATED ASSET MANAGEMENT – A PRELIMINARY STUDY UTILISING REAL-WORLD INFRASTRUCTURE DATAG. A. Boyes0C. Ellul1D. Irwin2Dept. of Civil, Environmental &Geomatic Engineering, UCL, Gower Street, London, WC1E 6BT, UKDept. of Civil, Environmental &Geomatic Engineering, UCL, Gower Street, London, WC1E 6BT, UKCrossrail Ltd. Floor 28, 25 Canada Square, Canary Wharf, London, E14 5LQ, UKThe use of 3D information models within collaborative working environments and the practice of Building Information Modelling (BIM) are becoming more commonplace within infrastructure projects. Currently used predominantly during the design and construction phase, the use of BIM is capable in theory of providing the information at handover that will satisfy the Asset Information Requirements (AIRs) of the future Infrastructure Manager (IM). One particular challenge is establishing a link between existing construction-centric information and the asset-centric information needed for future operations. Crossrail, a project to build a new high-frequency railway underneath London, is handling many such challenges as they prepare to handover their digital information to the future operator, in particular the need to provide a two-way link between a federated 3D CAD model and an object-relational Asset Information Management System (AIMS). This paper focusses on the potential for improved Asset Management (AM) by integrating BIM and GIS systems and practices, and makes a preliminary report on how 3D spatial queries can be used to establish a two-way relational link between two information systems (3D geometry and asset lists), as well as the challenges being overcome to transform the data to be suitable for AM.https://www.isprs-ann-photogramm-remote-sens-spatial-inf-sci.net/IV-4-W5/49/2017/isprs-annals-IV-4-W5-49-2017.pdf
collection DOAJ
language English
format Article
sources DOAJ
author G. A. Boyes
C. Ellul
D. Irwin
spellingShingle G. A. Boyes
C. Ellul
D. Irwin
EXPLORING BIM FOR OPERATIONAL INTEGRATED ASSET MANAGEMENT – A PRELIMINARY STUDY UTILISING REAL-WORLD INFRASTRUCTURE DATA
ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences
author_facet G. A. Boyes
C. Ellul
D. Irwin
author_sort G. A. Boyes
title EXPLORING BIM FOR OPERATIONAL INTEGRATED ASSET MANAGEMENT – A PRELIMINARY STUDY UTILISING REAL-WORLD INFRASTRUCTURE DATA
title_short EXPLORING BIM FOR OPERATIONAL INTEGRATED ASSET MANAGEMENT – A PRELIMINARY STUDY UTILISING REAL-WORLD INFRASTRUCTURE DATA
title_full EXPLORING BIM FOR OPERATIONAL INTEGRATED ASSET MANAGEMENT – A PRELIMINARY STUDY UTILISING REAL-WORLD INFRASTRUCTURE DATA
title_fullStr EXPLORING BIM FOR OPERATIONAL INTEGRATED ASSET MANAGEMENT – A PRELIMINARY STUDY UTILISING REAL-WORLD INFRASTRUCTURE DATA
title_full_unstemmed EXPLORING BIM FOR OPERATIONAL INTEGRATED ASSET MANAGEMENT – A PRELIMINARY STUDY UTILISING REAL-WORLD INFRASTRUCTURE DATA
title_sort exploring bim for operational integrated asset management – a preliminary study utilising real-world infrastructure data
publisher Copernicus Publications
series ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences
issn 2194-9042
2194-9050
publishDate 2017-10-01
description The use of 3D information models within collaborative working environments and the practice of Building Information Modelling (BIM) are becoming more commonplace within infrastructure projects. Currently used predominantly during the design and construction phase, the use of BIM is capable in theory of providing the information at handover that will satisfy the Asset Information Requirements (AIRs) of the future Infrastructure Manager (IM). One particular challenge is establishing a link between existing construction-centric information and the asset-centric information needed for future operations. Crossrail, a project to build a new high-frequency railway underneath London, is handling many such challenges as they prepare to handover their digital information to the future operator, in particular the need to provide a two-way link between a federated 3D CAD model and an object-relational Asset Information Management System (AIMS). This paper focusses on the potential for improved Asset Management (AM) by integrating BIM and GIS systems and practices, and makes a preliminary report on how 3D spatial queries can be used to establish a two-way relational link between two information systems (3D geometry and asset lists), as well as the challenges being overcome to transform the data to be suitable for AM.
url https://www.isprs-ann-photogramm-remote-sens-spatial-inf-sci.net/IV-4-W5/49/2017/isprs-annals-IV-4-W5-49-2017.pdf
work_keys_str_mv AT gaboyes exploringbimforoperationalintegratedassetmanagementndashapreliminarystudyutilisingrealworldinfrastructuredata
AT cellul exploringbimforoperationalintegratedassetmanagementndashapreliminarystudyutilisingrealworldinfrastructuredata
AT dirwin exploringbimforoperationalintegratedassetmanagementndashapreliminarystudyutilisingrealworldinfrastructuredata
_version_ 1725849842129829888