An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima Province

Due to rapid growth of Nakhon Ratchasima province. Land use and Land cover change (LULC) change takes place in surrounding end point of Motorway of Nakhon Ratchasima municipality and its vicinity, various types of environmental impacts occur in the area. Main objectives of the study are to assess...

Full description

Bibliographic Details
Main Author: Patiwat Littidej
Format: Article
Language:Thai
Published: Mahasarakham University 2019-06-01
Series:Warasan Witthayasat Lae Theknoloyi Mahawitthayalai Mahasarakham
Subjects:
Online Access:http://journal.msu.ac.th/upload/articles/article2486_58682.pdf
id doaj-db0a9ebf3dd6453c876e7873af9498c7
record_format Article
spelling doaj-db0a9ebf3dd6453c876e7873af9498c72020-11-25T03:56:53ZthaMahasarakham University Warasan Witthayasat Lae Theknoloyi Mahawitthayalai Mahasarakham1686-96642019-06-01383301315An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima ProvincePatiwat Littidej0Faculty of Informatics, Mahasarakham University, Kantharawichai District, Mahasarakham 44150, ThailandDue to rapid growth of Nakhon Ratchasima province. Land use and Land cover change (LULC) change takes place in surrounding end point of Motorway of Nakhon Ratchasima municipality and its vicinity, various types of environmental impacts occur in the area. Main objectives of the study are to assess built-up growth rate and mapping from transition matrix of satellite image during 2013-2016. Results of the built-up growth prediction of land cover in 2021 using CA-Markov showed that Motorway road was the strongest predictor variable and the most vulnerable landuse lost was miscellaneous. Urban and built-up areas had continuously increased while agricultural and forest had continuously decreased. Urban growth pattern was linear strip development but its pattern was changed to be a scattered development. The simulated area results in a shorter flow of water in stream order 1 to 2. The direction of the flow of water away from the main river (Lamtaklong). However, the forecast of urban growth pattern remains problematic because the model performed with a relatively moderate predictive ability (60 %) at a spatial unit of 1 km. x 1 km. This application of the CA-Markov model demonstrated an ability to address a range of local planning issue, but spatial accuracy and variable selection were among the factors that must be further considered for practical application.http://journal.msu.ac.th/upload/articles/article2486_58682.pdfbuilt-up growthmotorway-6 (m-6 bangpain-nakhon ratchasima)ca-markov modelstream flowgeographic information system (gis)
collection DOAJ
language Thai
format Article
sources DOAJ
author Patiwat Littidej
spellingShingle Patiwat Littidej
An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima Province
Warasan Witthayasat Lae Theknoloyi Mahawitthayalai Mahasarakham
built-up growth
motorway-6 (m-6 bangpain-nakhon ratchasima)
ca-markov model
stream flow
geographic information system (gis)
author_facet Patiwat Littidej
author_sort Patiwat Littidej
title An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima Province
title_short An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima Province
title_full An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima Province
title_fullStr An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima Province
title_full_unstemmed An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima Province
title_sort analysis of build-up growth impacts to water stream line of motorway-6 project end point in muang district of nakhon ratchasima province
publisher Mahasarakham University
series Warasan Witthayasat Lae Theknoloyi Mahawitthayalai Mahasarakham
issn 1686-9664
publishDate 2019-06-01
description Due to rapid growth of Nakhon Ratchasima province. Land use and Land cover change (LULC) change takes place in surrounding end point of Motorway of Nakhon Ratchasima municipality and its vicinity, various types of environmental impacts occur in the area. Main objectives of the study are to assess built-up growth rate and mapping from transition matrix of satellite image during 2013-2016. Results of the built-up growth prediction of land cover in 2021 using CA-Markov showed that Motorway road was the strongest predictor variable and the most vulnerable landuse lost was miscellaneous. Urban and built-up areas had continuously increased while agricultural and forest had continuously decreased. Urban growth pattern was linear strip development but its pattern was changed to be a scattered development. The simulated area results in a shorter flow of water in stream order 1 to 2. The direction of the flow of water away from the main river (Lamtaklong). However, the forecast of urban growth pattern remains problematic because the model performed with a relatively moderate predictive ability (60 %) at a spatial unit of 1 km. x 1 km. This application of the CA-Markov model demonstrated an ability to address a range of local planning issue, but spatial accuracy and variable selection were among the factors that must be further considered for practical application.
topic built-up growth
motorway-6 (m-6 bangpain-nakhon ratchasima)
ca-markov model
stream flow
geographic information system (gis)
url http://journal.msu.ac.th/upload/articles/article2486_58682.pdf
work_keys_str_mv AT patiwatlittidej ananalysisofbuildupgrowthimpactstowaterstreamlineofmotorway6projectendpointinmuangdistrictofnakhonratchasimaprovince
AT patiwatlittidej analysisofbuildupgrowthimpactstowaterstreamlineofmotorway6projectendpointinmuangdistrictofnakhonratchasimaprovince
_version_ 1724463241786032128