An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima Province
Due to rapid growth of Nakhon Ratchasima province. Land use and Land cover change (LULC) change takes place in surrounding end point of Motorway of Nakhon Ratchasima municipality and its vicinity, various types of environmental impacts occur in the area. Main objectives of the study are to assess...
Main Author: | |
---|---|
Format: | Article |
Language: | Thai |
Published: |
Mahasarakham University
2019-06-01
|
Series: | Warasan Witthayasat Lae Theknoloyi Mahawitthayalai Mahasarakham |
Subjects: | |
Online Access: | http://journal.msu.ac.th/upload/articles/article2486_58682.pdf |
id |
doaj-db0a9ebf3dd6453c876e7873af9498c7 |
---|---|
record_format |
Article |
spelling |
doaj-db0a9ebf3dd6453c876e7873af9498c72020-11-25T03:56:53ZthaMahasarakham University Warasan Witthayasat Lae Theknoloyi Mahawitthayalai Mahasarakham1686-96642019-06-01383301315An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima ProvincePatiwat Littidej0Faculty of Informatics, Mahasarakham University, Kantharawichai District, Mahasarakham 44150, ThailandDue to rapid growth of Nakhon Ratchasima province. Land use and Land cover change (LULC) change takes place in surrounding end point of Motorway of Nakhon Ratchasima municipality and its vicinity, various types of environmental impacts occur in the area. Main objectives of the study are to assess built-up growth rate and mapping from transition matrix of satellite image during 2013-2016. Results of the built-up growth prediction of land cover in 2021 using CA-Markov showed that Motorway road was the strongest predictor variable and the most vulnerable landuse lost was miscellaneous. Urban and built-up areas had continuously increased while agricultural and forest had continuously decreased. Urban growth pattern was linear strip development but its pattern was changed to be a scattered development. The simulated area results in a shorter flow of water in stream order 1 to 2. The direction of the flow of water away from the main river (Lamtaklong). However, the forecast of urban growth pattern remains problematic because the model performed with a relatively moderate predictive ability (60 %) at a spatial unit of 1 km. x 1 km. This application of the CA-Markov model demonstrated an ability to address a range of local planning issue, but spatial accuracy and variable selection were among the factors that must be further considered for practical application.http://journal.msu.ac.th/upload/articles/article2486_58682.pdfbuilt-up growthmotorway-6 (m-6 bangpain-nakhon ratchasima)ca-markov modelstream flowgeographic information system (gis) |
collection |
DOAJ |
language |
Thai |
format |
Article |
sources |
DOAJ |
author |
Patiwat Littidej |
spellingShingle |
Patiwat Littidej An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima Province Warasan Witthayasat Lae Theknoloyi Mahawitthayalai Mahasarakham built-up growth motorway-6 (m-6 bangpain-nakhon ratchasima) ca-markov model stream flow geographic information system (gis) |
author_facet |
Patiwat Littidej |
author_sort |
Patiwat Littidej |
title |
An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima Province |
title_short |
An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima Province |
title_full |
An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima Province |
title_fullStr |
An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima Province |
title_full_unstemmed |
An Analysis of Build-Up Growth Impacts to Water Stream Line of Motorway-6 Project End Point in Muang District of Nakhon Ratchasima Province |
title_sort |
analysis of build-up growth impacts to water stream line of motorway-6 project end point in muang district of nakhon ratchasima province |
publisher |
Mahasarakham University |
series |
Warasan Witthayasat Lae Theknoloyi Mahawitthayalai Mahasarakham |
issn |
1686-9664 |
publishDate |
2019-06-01 |
description |
Due to rapid growth of Nakhon Ratchasima province. Land use and Land cover change (LULC) change takes
place in surrounding end point of Motorway of Nakhon Ratchasima municipality and its vicinity, various types of
environmental impacts occur in the area. Main objectives of the study are to assess built-up growth rate and mapping from transition matrix of satellite image during 2013-2016. Results of the built-up growth prediction of land cover in 2021 using CA-Markov showed that Motorway road was the strongest predictor variable and the most vulnerable landuse lost was miscellaneous. Urban and built-up areas had continuously increased while agricultural and forest had continuously decreased. Urban growth pattern was linear strip development but its pattern was changed to be a scattered development. The simulated area results in a shorter flow of water in stream order 1 to 2. The direction of the flow of water away from the main river (Lamtaklong). However, the forecast of urban growth pattern remains problematic because the model performed with a relatively moderate predictive ability (60 %) at a spatial unit of 1 km. x 1 km. This application of the CA-Markov model demonstrated an ability to address a range of local planning issue,
but spatial accuracy and variable selection were among the factors that must be further considered for practical
application. |
topic |
built-up growth motorway-6 (m-6 bangpain-nakhon ratchasima) ca-markov model stream flow geographic information system (gis) |
url |
http://journal.msu.ac.th/upload/articles/article2486_58682.pdf |
work_keys_str_mv |
AT patiwatlittidej ananalysisofbuildupgrowthimpactstowaterstreamlineofmotorway6projectendpointinmuangdistrictofnakhonratchasimaprovince AT patiwatlittidej analysisofbuildupgrowthimpactstowaterstreamlineofmotorway6projectendpointinmuangdistrictofnakhonratchasimaprovince |
_version_ |
1724463241786032128 |