A Study on the LEED Energy Simulation Process Using BIM

In the domestic and international environmentally friendly certification system, energy-related credit occupies a high ratio in the total distribution of certification score Leadership in the Energy and Environmental Design (LEED) system is a certification system developed by the US Green Building C...

Full description

Bibliographic Details
Main Authors: Han-Soo Ryu, Kyung-Soon Park
Format: Article
Language:English
Published: MDPI AG 2016-02-01
Series:Sustainability
Subjects:
Online Access:http://www.mdpi.com/2071-1050/8/2/138
id doaj-da9864bd484f431b9a37adf16a359b2e
record_format Article
spelling doaj-da9864bd484f431b9a37adf16a359b2e2020-11-25T01:41:17ZengMDPI AGSustainability2071-10502016-02-018213810.3390/su8020138su8020138A Study on the LEED Energy Simulation Process Using BIMHan-Soo Ryu0Kyung-Soon Park1Department of Air Quality and Climate Change, ERM Korea Co., Ltd., Seoul 04505, KoreaDepartment of Building Systems Engineering, Dong-Eui University, Busan 47340, KoreaIn the domestic and international environmentally friendly certification system, energy-related credit occupies a high ratio in the total distribution of certification score Leadership in the Energy and Environmental Design (LEED) system is a certification system developed by the US Green Building Council (USGBC) in order to assess the environmental friendliness of buildings. The energy-related credit is approximately 30% of the total and also the energy simulation ratio specifically is the highest among the single credits as it is 20%. In this research, the energy simulation process using Building Information Modeling (BIM) based on the energy simulation case performed at the A-Tower, LEED certification was proposed. It places an emphasis on the verification process which was short in the previous research. The architectural geometry modeled through the BIM tool is converted to the gbXML, and in this process the geometry is verified through the interference check functions, the gbXML Viewer and the FZKViewer. The energy simulation is performed after the verification procedure. The geometry verification process in the A-Tower project is presented throughout this paper. In conclusion, an improved process is proposed for the productivity and reliability of energy simulation.http://www.mdpi.com/2071-1050/8/2/138Building Information Modeling (BIM)building energy simulation processLeadership in Energy and environmental Design (LEED)green building XML (gbXML)
collection DOAJ
language English
format Article
sources DOAJ
author Han-Soo Ryu
Kyung-Soon Park
spellingShingle Han-Soo Ryu
Kyung-Soon Park
A Study on the LEED Energy Simulation Process Using BIM
Sustainability
Building Information Modeling (BIM)
building energy simulation process
Leadership in Energy and environmental Design (LEED)
green building XML (gbXML)
author_facet Han-Soo Ryu
Kyung-Soon Park
author_sort Han-Soo Ryu
title A Study on the LEED Energy Simulation Process Using BIM
title_short A Study on the LEED Energy Simulation Process Using BIM
title_full A Study on the LEED Energy Simulation Process Using BIM
title_fullStr A Study on the LEED Energy Simulation Process Using BIM
title_full_unstemmed A Study on the LEED Energy Simulation Process Using BIM
title_sort study on the leed energy simulation process using bim
publisher MDPI AG
series Sustainability
issn 2071-1050
publishDate 2016-02-01
description In the domestic and international environmentally friendly certification system, energy-related credit occupies a high ratio in the total distribution of certification score Leadership in the Energy and Environmental Design (LEED) system is a certification system developed by the US Green Building Council (USGBC) in order to assess the environmental friendliness of buildings. The energy-related credit is approximately 30% of the total and also the energy simulation ratio specifically is the highest among the single credits as it is 20%. In this research, the energy simulation process using Building Information Modeling (BIM) based on the energy simulation case performed at the A-Tower, LEED certification was proposed. It places an emphasis on the verification process which was short in the previous research. The architectural geometry modeled through the BIM tool is converted to the gbXML, and in this process the geometry is verified through the interference check functions, the gbXML Viewer and the FZKViewer. The energy simulation is performed after the verification procedure. The geometry verification process in the A-Tower project is presented throughout this paper. In conclusion, an improved process is proposed for the productivity and reliability of energy simulation.
topic Building Information Modeling (BIM)
building energy simulation process
Leadership in Energy and environmental Design (LEED)
green building XML (gbXML)
url http://www.mdpi.com/2071-1050/8/2/138
work_keys_str_mv AT hansooryu astudyontheleedenergysimulationprocessusingbim
AT kyungsoonpark astudyontheleedenergysimulationprocessusingbim
AT hansooryu studyontheleedenergysimulationprocessusingbim
AT kyungsoonpark studyontheleedenergysimulationprocessusingbim
_version_ 1725041646452604928