Constructed wetlands aided with bio-preparation to neutralize wastewater from a small fruit and vegetable processing plant with high load pollutants
The research was carried out for real wastewater collected directly from a fruit and vegetable plant located in north-eastern Poland. Effectiveness of organic matter metabolism expressed as BOD5, COD, total suspended solids depending on the load of pollutants and bio-preparation, was determined. The...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/26/e3sconf_eko-dok2019_00067.pdf |
id |
doaj-d9c3199b019b4adbb2cad1850558725f |
---|---|
record_format |
Article |
spelling |
doaj-d9c3199b019b4adbb2cad1850558725f2021-02-02T04:10:53ZengEDP SciencesE3S Web of Conferences2267-12422019-01-011000006710.1051/e3sconf/201910000067e3sconf_eko-dok2019_00067Constructed wetlands aided with bio-preparation to neutralize wastewater from a small fruit and vegetable processing plant with high load pollutantsPuchlik Monika0Bialystok Technical University, Faculty of Civil and Environmental Engineering, Chemical LaboratoryThe research was carried out for real wastewater collected directly from a fruit and vegetable plant located in north-eastern Poland. Effectiveness of organic matter metabolism expressed as BOD5, COD, total suspended solids depending on the load of pollutants and bio-preparation, was determined. The use of bio-preparation in the constructed wetland allowed to increase the efficiency of wastewater treatment throughout the research period: for BOD5 by 94% in deposit with bio-preparation and by 87% in deposit without the addition of bio-preparation; however, for COD – by 93% in deposit with the addition of bio-preparation and by 87% in deposit without bio-preparation added.https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/26/e3sconf_eko-dok2019_00067.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Puchlik Monika |
spellingShingle |
Puchlik Monika Constructed wetlands aided with bio-preparation to neutralize wastewater from a small fruit and vegetable processing plant with high load pollutants E3S Web of Conferences |
author_facet |
Puchlik Monika |
author_sort |
Puchlik Monika |
title |
Constructed wetlands aided with bio-preparation to neutralize wastewater from a small fruit and vegetable processing plant with high load pollutants |
title_short |
Constructed wetlands aided with bio-preparation to neutralize wastewater from a small fruit and vegetable processing plant with high load pollutants |
title_full |
Constructed wetlands aided with bio-preparation to neutralize wastewater from a small fruit and vegetable processing plant with high load pollutants |
title_fullStr |
Constructed wetlands aided with bio-preparation to neutralize wastewater from a small fruit and vegetable processing plant with high load pollutants |
title_full_unstemmed |
Constructed wetlands aided with bio-preparation to neutralize wastewater from a small fruit and vegetable processing plant with high load pollutants |
title_sort |
constructed wetlands aided with bio-preparation to neutralize wastewater from a small fruit and vegetable processing plant with high load pollutants |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2019-01-01 |
description |
The research was carried out for real wastewater collected directly from a fruit and vegetable plant located in north-eastern Poland. Effectiveness of organic matter metabolism expressed as BOD5, COD, total suspended solids depending on the load of pollutants and bio-preparation, was determined. The use of bio-preparation in the constructed wetland allowed to increase the efficiency of wastewater treatment throughout the research period: for BOD5 by 94% in deposit with bio-preparation and by 87% in deposit without the addition of bio-preparation; however, for COD – by 93% in deposit with the addition of bio-preparation and by 87% in deposit without bio-preparation added. |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/26/e3sconf_eko-dok2019_00067.pdf |
work_keys_str_mv |
AT puchlikmonika constructedwetlandsaidedwithbiopreparationtoneutralizewastewaterfromasmallfruitandvegetableprocessingplantwithhighloadpollutants |
_version_ |
1724306266126286848 |