Perfect order fulfillment in construction supply chain performance
The problem of construction supply chains is the fragmentation of unsustainable projects such as manufacturing. Therefore it is necessary to have supply chain performance indicator standards related to the procurement of materials that can be used as a reference for the performance of a project or c...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2020-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/62/e3sconf_icenis2020_13001.pdf |
id |
doaj-d806f169a56946028c468f83b9881767 |
---|---|
record_format |
Article |
spelling |
doaj-d806f169a56946028c468f83b98817672021-04-02T13:10:43ZengEDP SciencesE3S Web of Conferences2267-12422020-01-012021300110.1051/e3sconf/202020213001e3sconf_icenis2020_13001Perfect order fulfillment in construction supply chain performanceNur Sholeh MohSuwarto FardzanelaThe problem of construction supply chains is the fragmentation of unsustainable projects such as manufacturing. Therefore it is necessary to have supply chain performance indicator standards related to the procurement of materials that can be used as a reference for the performance of a project or contractor. The purpose of this study is to measure the performance of the construction supply chain with the perfect order fulfillment (POF) indicator adopted from the Supply Chain Operations Reference (SCOR) 12.0. The adoption stage starts from the definition in construction to the calculation of indicators in the project. The results showed that suppliers of steel and ready mix concrete at close range from the project had better performance. In the case study, the perfect order fulfillment performance of steel suppliers with a distance of 345 km is worth 89.476% while suppliers with a distance of 540 km are worth 87.535%. The supplier of ready mix concrete within 7.3 km is worth 95.355% and the supplier with a distance of 15.7 km is 91.705%.https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/62/e3sconf_icenis2020_13001.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Nur Sholeh Moh Suwarto Fardzanela |
spellingShingle |
Nur Sholeh Moh Suwarto Fardzanela Perfect order fulfillment in construction supply chain performance E3S Web of Conferences |
author_facet |
Nur Sholeh Moh Suwarto Fardzanela |
author_sort |
Nur Sholeh Moh |
title |
Perfect order fulfillment in construction supply chain performance |
title_short |
Perfect order fulfillment in construction supply chain performance |
title_full |
Perfect order fulfillment in construction supply chain performance |
title_fullStr |
Perfect order fulfillment in construction supply chain performance |
title_full_unstemmed |
Perfect order fulfillment in construction supply chain performance |
title_sort |
perfect order fulfillment in construction supply chain performance |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2020-01-01 |
description |
The problem of construction supply chains is the fragmentation of unsustainable projects such as manufacturing. Therefore it is necessary to have supply chain performance indicator standards related to the procurement of materials that can be used as a reference for the performance of a project or contractor. The purpose of this study is to measure the performance of the construction supply chain with the perfect order fulfillment (POF) indicator adopted from the Supply Chain Operations Reference (SCOR) 12.0. The adoption stage starts from the definition in construction to the calculation of indicators in the project. The results showed that suppliers of steel and ready mix concrete at close range from the project had better performance. In the case study, the perfect order fulfillment performance of steel suppliers with a distance of 345 km is worth 89.476% while suppliers with a distance of 540 km are worth 87.535%. The supplier of ready mix concrete within 7.3 km is worth 95.355% and the supplier with a distance of 15.7 km is 91.705%. |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/62/e3sconf_icenis2020_13001.pdf |
work_keys_str_mv |
AT nursholehmoh perfectorderfulfillmentinconstructionsupplychainperformance AT suwartofardzanela perfectorderfulfillmentinconstructionsupplychainperformance |
_version_ |
1721566092455837696 |