REQUIREMENTS OF MODERNIZATION ASSESSMENT AND MAINTENANCE OF THE NORTH CHANNEL OF OBRA

In an attempt to assess the needs of the modernization of the North Channel of Obra, the construction began in 1852. The condition of drainage occurring on this course coming generally from the early 20th century and is unsatisfactory. This is the result of longstanding neglect and lack of maintenan...

Full description

Bibliographic Details
Main Authors: Paweł Kozaczyk, Piotr Stachowski, Daniel Liberacki
Format: Article
Language:Polish
Published: Polish Society of Ecological Engineering (PTIE) 2015-07-01
Series:Inżynieria Ekologiczna
Subjects:
Online Access:http://www.journalssystem.com/ie/OCENA-POTRZEB-MODERNIZACJI-I-KONSERWACJI-POLNOCNEGO-KANALU-OBRY,58915,0,2.html
id doaj-d75baae681be498f9098398c23dc1831
record_format Article
spelling doaj-d75baae681be498f9098398c23dc18312020-11-24T22:37:42ZpolPolish Society of Ecological Engineering (PTIE)Inżynieria Ekologiczna2081-139X2392-06292015-07-014313914510.12912/23920629/5891558915REQUIREMENTS OF MODERNIZATION ASSESSMENT AND MAINTENANCE OF THE NORTH CHANNEL OF OBRAPaweł Kozaczyk0Piotr Stachowski1Daniel Liberacki2Instytut Melioracji i Inżynierii Środowiska, Uniwersytet Przyrodniczy w Poznaniu, ul. Piątkowska 94, 60-649 PoznańInstytut Melioracji i Inżynierii Środowiska, Uniwersytet Przyrodniczy w Poznaniu, ul. Piątkowska 94, 60-649 PoznańInstytut Melioracji i Inżynierii Środowiska, Uniwersytet Przyrodniczy w Poznaniu, ul. Piątkowska 94, 60-649 PoznańIn an attempt to assess the needs of the modernization of the North Channel of Obra, the construction began in 1852. The condition of drainage occurring on this course coming generally from the early 20th century and is unsatisfactory. This is the result of longstanding neglect and lack of maintenance. The first modernization works started in 1986. Undergoing on the North Channel of Obra are primarily made in the framework of four tasks, which was the regulation of the water course on a length of approximately 35 km 8 dams were built and 9 dams were demolished. The cost of upgrading the North Channel of The Obra was significantly different, what is the result of the works. They include the cost of reconstruction of the drainage channels, and the reconstruction of hydraulic structures. At this work, in addition to the needs assessment of the North Channel of Obra, further modernization needs were indicated.http://www.journalssystem.com/ie/OCENA-POTRZEB-MODERNIZACJI-I-KONSERWACJI-POLNOCNEGO-KANALU-OBRY,58915,0,2.htmlmodernizationwatershedchaneldrainage
collection DOAJ
language Polish
format Article
sources DOAJ
author Paweł Kozaczyk
Piotr Stachowski
Daniel Liberacki
spellingShingle Paweł Kozaczyk
Piotr Stachowski
Daniel Liberacki
REQUIREMENTS OF MODERNIZATION ASSESSMENT AND MAINTENANCE OF THE NORTH CHANNEL OF OBRA
Inżynieria Ekologiczna
modernization
watershed
chanel
drainage
author_facet Paweł Kozaczyk
Piotr Stachowski
Daniel Liberacki
author_sort Paweł Kozaczyk
title REQUIREMENTS OF MODERNIZATION ASSESSMENT AND MAINTENANCE OF THE NORTH CHANNEL OF OBRA
title_short REQUIREMENTS OF MODERNIZATION ASSESSMENT AND MAINTENANCE OF THE NORTH CHANNEL OF OBRA
title_full REQUIREMENTS OF MODERNIZATION ASSESSMENT AND MAINTENANCE OF THE NORTH CHANNEL OF OBRA
title_fullStr REQUIREMENTS OF MODERNIZATION ASSESSMENT AND MAINTENANCE OF THE NORTH CHANNEL OF OBRA
title_full_unstemmed REQUIREMENTS OF MODERNIZATION ASSESSMENT AND MAINTENANCE OF THE NORTH CHANNEL OF OBRA
title_sort requirements of modernization assessment and maintenance of the north channel of obra
publisher Polish Society of Ecological Engineering (PTIE)
series Inżynieria Ekologiczna
issn 2081-139X
2392-0629
publishDate 2015-07-01
description In an attempt to assess the needs of the modernization of the North Channel of Obra, the construction began in 1852. The condition of drainage occurring on this course coming generally from the early 20th century and is unsatisfactory. This is the result of longstanding neglect and lack of maintenance. The first modernization works started in 1986. Undergoing on the North Channel of Obra are primarily made in the framework of four tasks, which was the regulation of the water course on a length of approximately 35 km 8 dams were built and 9 dams were demolished. The cost of upgrading the North Channel of The Obra was significantly different, what is the result of the works. They include the cost of reconstruction of the drainage channels, and the reconstruction of hydraulic structures. At this work, in addition to the needs assessment of the North Channel of Obra, further modernization needs were indicated.
topic modernization
watershed
chanel
drainage
url http://www.journalssystem.com/ie/OCENA-POTRZEB-MODERNIZACJI-I-KONSERWACJI-POLNOCNEGO-KANALU-OBRY,58915,0,2.html
work_keys_str_mv AT pawełkozaczyk requirementsofmodernizationassessmentandmaintenanceofthenorthchannelofobra
AT piotrstachowski requirementsofmodernizationassessmentandmaintenanceofthenorthchannelofobra
AT danielliberacki requirementsofmodernizationassessmentandmaintenanceofthenorthchannelofobra
_version_ 1725715828864712704