Calculation of optimized methods of the river underwater pipeline backfill with the use of APMWinMachine 9.7
Nowadays, the standard techniques of backing the ballasted pipeline laid in a bottom trench are used: sequential deposition of soil by suction dredges along the slurry pipeline, soil discharge by self-dumping barges, soil unloading from a barge by the grapple, soil pumping from barges. The disadvant...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Peter the Great St. Petersburg Polytechnic University
2016-12-01
|
Series: | Инженерно-строительный журнал |
Subjects: | |
Online Access: | http://engstroy.spbstu.ru/eng/index_2016_05/04.html |