Integrated techniques for rapid and highly-efficient development and production of ultra-deep tight sand gas reservoirs of Keshen 8 Block in the Tarim Basin
The unusually ultra-deep and ultra-high-pressure gas reservoirs in the Keshen 8 Block on the Kelasu structural belt of the Tarim Basin are also featured by high temperature, well-developed fault fissures, huge thickness, tight matrix, complex oil–water distribution, etc., which brings about great di...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
KeAi Communications Co., Ltd.
2017-01-01
|
Series: | Natural Gas Industry B |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2352854017300591 |
id |
doaj-d6ff57bf32b4447480fcf560047e9b08 |
---|---|
record_format |
Article |
spelling |
doaj-d6ff57bf32b4447480fcf560047e9b082021-03-02T10:22:04ZengKeAi Communications Co., Ltd.Natural Gas Industry B2352-85402017-01-0141303810.1016/j.ngib.2017.07.005Integrated techniques for rapid and highly-efficient development and production of ultra-deep tight sand gas reservoirs of Keshen 8 Block in the Tarim BasinTongwen JiangXueqing TengXiangtong YangThe unusually ultra-deep and ultra-high-pressure gas reservoirs in the Keshen 8 Block on the Kelasu structural belt of the Tarim Basin are also featured by high temperature, well-developed fault fissures, huge thickness, tight matrix, complex oil–water distribution, etc., which brings about great difficulties to reserves evaluation and further development. In view of this, an overall study was made on the fine description of reservoir fractures and their seepage mechanism, technical problems were being tackled on seismic data processing and interpretation of complex and high & steep structural zones, optimal development design, safe & rapid drilling and completion wells, reservoir stimulation, dynamic monitoring, etc. to promote the development level of such ultra-deep tight gas reservoirs, and 22 complete sets of specific techniques were formulated in the fields of high-efficiency well spacing, safe and fast drilling, recovery enhancement by well completion transformation, efficient development of optimization design, and so on. Through the technical progress and innovative management of integrated exploration & development, reserves evaluation and productivity construction have been completed on the Keshen 8 Block in the last three years of the 12th Five-Year Plan period (2011–2015), as a result, rapid and high-efficiency productivity construction is realized, and a new area is explored in the development of ultra-deep and ultra-high-pressure fractured tight sand gas reservoirs. This study is of great reference to the development of similar gas reservoirs at home and abroad.http://www.sciencedirect.com/science/article/pii/S2352854017300591Tarim BasinKeshen gas fieldUltra-deep and ultra-high-pressure gas reservoirTight sand reservoirHigh-efficiency developmentOptimal designRapid drillingReservoir stimulationProductivity construction |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Tongwen Jiang Xueqing Teng Xiangtong Yang |
spellingShingle |
Tongwen Jiang Xueqing Teng Xiangtong Yang Integrated techniques for rapid and highly-efficient development and production of ultra-deep tight sand gas reservoirs of Keshen 8 Block in the Tarim Basin Natural Gas Industry B Tarim Basin Keshen gas field Ultra-deep and ultra-high-pressure gas reservoir Tight sand reservoir High-efficiency development Optimal design Rapid drilling Reservoir stimulation Productivity construction |
author_facet |
Tongwen Jiang Xueqing Teng Xiangtong Yang |
author_sort |
Tongwen Jiang |
title |
Integrated techniques for rapid and highly-efficient development and production of ultra-deep tight sand gas reservoirs of Keshen 8 Block in the Tarim Basin |
title_short |
Integrated techniques for rapid and highly-efficient development and production of ultra-deep tight sand gas reservoirs of Keshen 8 Block in the Tarim Basin |
title_full |
Integrated techniques for rapid and highly-efficient development and production of ultra-deep tight sand gas reservoirs of Keshen 8 Block in the Tarim Basin |
title_fullStr |
Integrated techniques for rapid and highly-efficient development and production of ultra-deep tight sand gas reservoirs of Keshen 8 Block in the Tarim Basin |
title_full_unstemmed |
Integrated techniques for rapid and highly-efficient development and production of ultra-deep tight sand gas reservoirs of Keshen 8 Block in the Tarim Basin |
title_sort |
integrated techniques for rapid and highly-efficient development and production of ultra-deep tight sand gas reservoirs of keshen 8 block in the tarim basin |
publisher |
KeAi Communications Co., Ltd. |
series |
Natural Gas Industry B |
issn |
2352-8540 |
publishDate |
2017-01-01 |
description |
The unusually ultra-deep and ultra-high-pressure gas reservoirs in the Keshen 8 Block on the Kelasu structural belt of the Tarim Basin are also featured by high temperature, well-developed fault fissures, huge thickness, tight matrix, complex oil–water distribution, etc., which brings about great difficulties to reserves evaluation and further development. In view of this, an overall study was made on the fine description of reservoir fractures and their seepage mechanism, technical problems were being tackled on seismic data processing and interpretation of complex and high & steep structural zones, optimal development design, safe & rapid drilling and completion wells, reservoir stimulation, dynamic monitoring, etc. to promote the development level of such ultra-deep tight gas reservoirs, and 22 complete sets of specific techniques were formulated in the fields of high-efficiency well spacing, safe and fast drilling, recovery enhancement by well completion transformation, efficient development of optimization design, and so on. Through the technical progress and innovative management of integrated exploration & development, reserves evaluation and productivity construction have been completed on the Keshen 8 Block in the last three years of the 12th Five-Year Plan period (2011–2015), as a result, rapid and high-efficiency productivity construction is realized, and a new area is explored in the development of ultra-deep and ultra-high-pressure fractured tight sand gas reservoirs. This study is of great reference to the development of similar gas reservoirs at home and abroad. |
topic |
Tarim Basin Keshen gas field Ultra-deep and ultra-high-pressure gas reservoir Tight sand reservoir High-efficiency development Optimal design Rapid drilling Reservoir stimulation Productivity construction |
url |
http://www.sciencedirect.com/science/article/pii/S2352854017300591 |
work_keys_str_mv |
AT tongwenjiang integratedtechniquesforrapidandhighlyefficientdevelopmentandproductionofultradeeptightsandgasreservoirsofkeshen8blockinthetarimbasin AT xueqingteng integratedtechniquesforrapidandhighlyefficientdevelopmentandproductionofultradeeptightsandgasreservoirsofkeshen8blockinthetarimbasin AT xiangtongyang integratedtechniquesforrapidandhighlyefficientdevelopmentandproductionofultradeeptightsandgasreservoirsofkeshen8blockinthetarimbasin |
_version_ |
1724237099425595392 |