Life Cycle Cost Assessment of Preventive Strategies Applied to Prestressed Concrete Bridges Exposed to Chlorides
This paper applies Life Cycle Assessment methodology to aid in the decision making to select the preventive measure against chloride corrosion in concrete structures that works best for the socio-economic context of the structure. The assumed model combines the concepts of Life Cycle Cost Analysis a...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2018-03-01
|
Series: | Sustainability |
Subjects: | |
Online Access: | http://www.mdpi.com/2071-1050/10/3/845 |
id |
doaj-d6e40fde9e4a46439a2263878a50993e |
---|---|
record_format |
Article |
spelling |
doaj-d6e40fde9e4a46439a2263878a50993e2020-11-24T23:00:04ZengMDPI AGSustainability2071-10502018-03-0110384510.3390/su10030845su10030845Life Cycle Cost Assessment of Preventive Strategies Applied to Prestressed Concrete Bridges Exposed to ChloridesIgnacio J. Navarro0Víctor Yepes1José V. Martí2Department of Construction Engineering, Universitat Politècnica de València, 46022 Valencia, SpainInstitute of Concrete Science and Technology (ICITECH), Universitat Politècnica de València, 46022 Valencia, SpainInstitute of Concrete Science and Technology (ICITECH), Universitat Politècnica de València, 46022 Valencia, SpainThis paper applies Life Cycle Assessment methodology to aid in the decision making to select the preventive measure against chloride corrosion in concrete structures that works best for the socio-economic context of the structure. The assumed model combines the concepts of Life Cycle Cost Analysis and Social Life Cycle Analysis to assess the impacts on users derived from the maintenance activities associated with each alternative analyzed in terms of economic costs. The model has been applied to a prestressed concrete bridge to obtain a preventive measure that can reduce the total costs incurred over the period of analysis by up to 58.5% compared to the cost of the current solution.http://www.mdpi.com/2071-1050/10/3/845Life Cycle AssessmentSocial Life Cycle Analysisreinforced concretechloride corrosionpreventive measures |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Ignacio J. Navarro Víctor Yepes José V. Martí |
spellingShingle |
Ignacio J. Navarro Víctor Yepes José V. Martí Life Cycle Cost Assessment of Preventive Strategies Applied to Prestressed Concrete Bridges Exposed to Chlorides Sustainability Life Cycle Assessment Social Life Cycle Analysis reinforced concrete chloride corrosion preventive measures |
author_facet |
Ignacio J. Navarro Víctor Yepes José V. Martí |
author_sort |
Ignacio J. Navarro |
title |
Life Cycle Cost Assessment of Preventive Strategies Applied to Prestressed Concrete Bridges Exposed to Chlorides |
title_short |
Life Cycle Cost Assessment of Preventive Strategies Applied to Prestressed Concrete Bridges Exposed to Chlorides |
title_full |
Life Cycle Cost Assessment of Preventive Strategies Applied to Prestressed Concrete Bridges Exposed to Chlorides |
title_fullStr |
Life Cycle Cost Assessment of Preventive Strategies Applied to Prestressed Concrete Bridges Exposed to Chlorides |
title_full_unstemmed |
Life Cycle Cost Assessment of Preventive Strategies Applied to Prestressed Concrete Bridges Exposed to Chlorides |
title_sort |
life cycle cost assessment of preventive strategies applied to prestressed concrete bridges exposed to chlorides |
publisher |
MDPI AG |
series |
Sustainability |
issn |
2071-1050 |
publishDate |
2018-03-01 |
description |
This paper applies Life Cycle Assessment methodology to aid in the decision making to select the preventive measure against chloride corrosion in concrete structures that works best for the socio-economic context of the structure. The assumed model combines the concepts of Life Cycle Cost Analysis and Social Life Cycle Analysis to assess the impacts on users derived from the maintenance activities associated with each alternative analyzed in terms of economic costs. The model has been applied to a prestressed concrete bridge to obtain a preventive measure that can reduce the total costs incurred over the period of analysis by up to 58.5% compared to the cost of the current solution. |
topic |
Life Cycle Assessment Social Life Cycle Analysis reinforced concrete chloride corrosion preventive measures |
url |
http://www.mdpi.com/2071-1050/10/3/845 |
work_keys_str_mv |
AT ignaciojnavarro lifecyclecostassessmentofpreventivestrategiesappliedtoprestressedconcretebridgesexposedtochlorides AT victoryepes lifecyclecostassessmentofpreventivestrategiesappliedtoprestressedconcretebridgesexposedtochlorides AT josevmarti lifecyclecostassessmentofpreventivestrategiesappliedtoprestressedconcretebridgesexposedtochlorides |
_version_ |
1725642843500838912 |