Analysis of Unit Process Cost for an Engineering-Scale Pyroprocess Facility Using a Process Costing Method in Korea
Pyroprocessing, which is a dry recycling method, converts spent nuclear fuel into U (Uranium)/TRU (TRansUranium) metal ingots in a high-temperature molten salt phase. This paper provides the unit process cost of a pyroprocess facility that can process up to 10 tons of pyroprocessing product per year...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2015-08-01
|
Series: | Energies |
Subjects: | |
Online Access: | http://www.mdpi.com/1996-1073/8/8/8775 |
id |
doaj-d6b333e523d045e2aed9fa7e25170338 |
---|---|
record_format |
Article |
spelling |
doaj-d6b333e523d045e2aed9fa7e251703382020-11-24T22:55:54ZengMDPI AGEnergies1996-10732015-08-01888775879710.3390/en8088775en8088775Analysis of Unit Process Cost for an Engineering-Scale Pyroprocess Facility Using a Process Costing Method in KoreaSungki Kim0Wonil Ko1Sungsig Bang2Korea Atomic Energy Research Institute, 1045 Daedeokdaero, Yuseong-gu, Daejeon 305-353, Republic of KoreaKorea Atomic Energy Research Institute, 1045 Daedeokdaero, Yuseong-gu, Daejeon 305-353, Republic of KoreaDepartment of Business and Technology Management, Korea Advanced Institute of Science and Technology, 291 Deahak-ro, Yuseong-gu, Daejeon 305-701, Republic of KoreaPyroprocessing, which is a dry recycling method, converts spent nuclear fuel into U (Uranium)/TRU (TRansUranium) metal ingots in a high-temperature molten salt phase. This paper provides the unit process cost of a pyroprocess facility that can process up to 10 tons of pyroprocessing product per year by utilizing the process costing method. Toward this end, the pyroprocess was classified into four kinds of unit processes: pretreatment, electrochemical reduction, electrorefining and electrowinning. The unit process cost was calculated by classifying the cost consumed at each process into raw material and conversion costs. The unit process costs of the pretreatment, electrochemical reduction, electrorefining and electrowinning were calculated as 195 US$/kgU-TRU, 310 US$/kgU-TRU, 215 US$/kgU-TRU and 231 US$/kgU-TRU, respectively. Finally the total pyroprocess cost was calculated as 951 US$/kgU-TRU. In addition, the cost driver for the raw material cost was identified as the cost for Li3PO4, needed for the LiCl-KCl purification process, and platinum as an anode electrode in the electrochemical reduction process.http://www.mdpi.com/1996-1073/8/8/8775pyroprocess facilityprocess costing methodFirst-In First-Out methodcost driverunit processunit cost |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Sungki Kim Wonil Ko Sungsig Bang |
spellingShingle |
Sungki Kim Wonil Ko Sungsig Bang Analysis of Unit Process Cost for an Engineering-Scale Pyroprocess Facility Using a Process Costing Method in Korea Energies pyroprocess facility process costing method First-In First-Out method cost driver unit process unit cost |
author_facet |
Sungki Kim Wonil Ko Sungsig Bang |
author_sort |
Sungki Kim |
title |
Analysis of Unit Process Cost for an Engineering-Scale Pyroprocess Facility Using a Process Costing Method in Korea |
title_short |
Analysis of Unit Process Cost for an Engineering-Scale Pyroprocess Facility Using a Process Costing Method in Korea |
title_full |
Analysis of Unit Process Cost for an Engineering-Scale Pyroprocess Facility Using a Process Costing Method in Korea |
title_fullStr |
Analysis of Unit Process Cost for an Engineering-Scale Pyroprocess Facility Using a Process Costing Method in Korea |
title_full_unstemmed |
Analysis of Unit Process Cost for an Engineering-Scale Pyroprocess Facility Using a Process Costing Method in Korea |
title_sort |
analysis of unit process cost for an engineering-scale pyroprocess facility using a process costing method in korea |
publisher |
MDPI AG |
series |
Energies |
issn |
1996-1073 |
publishDate |
2015-08-01 |
description |
Pyroprocessing, which is a dry recycling method, converts spent nuclear fuel into U (Uranium)/TRU (TRansUranium) metal ingots in a high-temperature molten salt phase. This paper provides the unit process cost of a pyroprocess facility that can process up to 10 tons of pyroprocessing product per year by utilizing the process costing method. Toward this end, the pyroprocess was classified into four kinds of unit processes: pretreatment, electrochemical reduction, electrorefining and electrowinning. The unit process cost was calculated by classifying the cost consumed at each process into raw material and conversion costs. The unit process costs of the pretreatment, electrochemical reduction, electrorefining and electrowinning were calculated as 195 US$/kgU-TRU, 310 US$/kgU-TRU, 215 US$/kgU-TRU and 231 US$/kgU-TRU, respectively. Finally the total pyroprocess cost was calculated as 951 US$/kgU-TRU. In addition, the cost driver for the raw material cost was identified as the cost for Li3PO4, needed for the LiCl-KCl purification process, and platinum as an anode electrode in the electrochemical reduction process. |
topic |
pyroprocess facility process costing method First-In First-Out method cost driver unit process unit cost |
url |
http://www.mdpi.com/1996-1073/8/8/8775 |
work_keys_str_mv |
AT sungkikim analysisofunitprocesscostforanengineeringscalepyroprocessfacilityusingaprocesscostingmethodinkorea AT wonilko analysisofunitprocesscostforanengineeringscalepyroprocessfacilityusingaprocesscostingmethodinkorea AT sungsigbang analysisofunitprocesscostforanengineeringscalepyroprocessfacilityusingaprocesscostingmethodinkorea |
_version_ |
1725655897615630336 |