Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availabi...
Main Authors: | Stevan Djenadic, Dragan Ignjatovic, Milos Tanasijevic, Ugljesa Bugaric, Ivan Jankovic, Tomislav Subaranovic |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2019-10-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/12/21/4044 |
Similar Items
-
CALCULATION OF EFFORTS OF DIGGING BY THE WORKING EQUIPMENT OF THE BULLDOZER
by: A. I. Demidenko, et al.
Published: (2017-08-01) -
Squatting to end domicide? Resisting bulldozer urbanism in contemporary Shanghai
by: Zhang, Yunpeng
Published: (2015-09-01) -
Estimation of cost and the amount of production in construction of forest road by combining hydraulic excavator and bulldozer (Case study: Liashisera district, Guilan Province)
by: Keivan Hosseinpour Asli, et al.
Published: (2015-06-01) -
A working design of a bulldozer blade as additional equipment of a compaction drum roller
by: Selech Jarosław, et al.
Published: (2019-01-01) -
Combining Off-the-Job Productivity Regression Model with EPA’s NONROAD Model in Estimating CO2 Emissions from Bulldozer
by: Apif M. Hajji, et al.
Published: (2017-09-01)