Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine

Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availabi...

Full description

Bibliographic Details
Main Authors: Stevan Djenadic, Dragan Ignjatovic, Milos Tanasijevic, Ugljesa Bugaric, Ivan Jankovic, Tomislav Subaranovic
Format: Article
Language:English
Published: MDPI AG 2019-10-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/12/21/4044
id doaj-d6131ea83c44456eb528256c1dbbc8b1
record_format Article
spelling doaj-d6131ea83c44456eb528256c1dbbc8b12020-11-25T02:16:16ZengMDPI AGEnergies1996-10732019-10-011221404410.3390/en12214044en12214044Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite MineStevan Djenadic0Dragan Ignjatovic1Milos Tanasijevic2Ugljesa Bugaric3Ivan Jankovic4Tomislav Subaranovic5Faculty of Mining and Geology, University of Belgrade, 11000 Belgrade, SerbiaFaculty of Mining and Geology, University of Belgrade, 11000 Belgrade, SerbiaFaculty of Mining and Geology, University of Belgrade, 11000 Belgrade, SerbiaFaculty of Mechanical Engineering, University of Belgrade, 11000 Belgrade, SerbiaMinistry of Mining and Energy, 11000 Belgrade, SerbiaFaculty of Mining and Geology, University of Belgrade, 11000 Belgrade, SerbiaAvailability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the coefficient of time use of the machine. This approach is not good enough because it does not go into the structure of the availability itself and requires a high level of IT support in system monitoring. In this sense, this paper will use the fuzzy theory and the corresponding analytic hierarchy process (AHP) multi-criteria analysis to present a conceptual and mathematical model for the assessment of availability based on expert judgment. The model will be shown in the case study (on the example) of bulldozers working in the open-pit lignite mine.https://www.mdpi.com/1996-1073/12/21/4044availabilityfuzzy theoryahp multi-criteria analysisexpert judgmentbulldozer
collection DOAJ
language English
format Article
sources DOAJ
author Stevan Djenadic
Dragan Ignjatovic
Milos Tanasijevic
Ugljesa Bugaric
Ivan Jankovic
Tomislav Subaranovic
spellingShingle Stevan Djenadic
Dragan Ignjatovic
Milos Tanasijevic
Ugljesa Bugaric
Ivan Jankovic
Tomislav Subaranovic
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
Energies
availability
fuzzy theory
ahp multi-criteria analysis
expert judgment
bulldozer
author_facet Stevan Djenadic
Dragan Ignjatovic
Milos Tanasijevic
Ugljesa Bugaric
Ivan Jankovic
Tomislav Subaranovic
author_sort Stevan Djenadic
title Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
title_short Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
title_full Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
title_fullStr Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
title_full_unstemmed Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
title_sort development of the availability concept by using fuzzy theory with ahp correction, a case study: bulldozers in the open-pit lignite mine
publisher MDPI AG
series Energies
issn 1996-1073
publishDate 2019-10-01
description Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the coefficient of time use of the machine. This approach is not good enough because it does not go into the structure of the availability itself and requires a high level of IT support in system monitoring. In this sense, this paper will use the fuzzy theory and the corresponding analytic hierarchy process (AHP) multi-criteria analysis to present a conceptual and mathematical model for the assessment of availability based on expert judgment. The model will be shown in the case study (on the example) of bulldozers working in the open-pit lignite mine.
topic availability
fuzzy theory
ahp multi-criteria analysis
expert judgment
bulldozer
url https://www.mdpi.com/1996-1073/12/21/4044
work_keys_str_mv AT stevandjenadic developmentoftheavailabilityconceptbyusingfuzzytheorywithahpcorrectionacasestudybulldozersintheopenpitlignitemine
AT draganignjatovic developmentoftheavailabilityconceptbyusingfuzzytheorywithahpcorrectionacasestudybulldozersintheopenpitlignitemine
AT milostanasijevic developmentoftheavailabilityconceptbyusingfuzzytheorywithahpcorrectionacasestudybulldozersintheopenpitlignitemine
AT ugljesabugaric developmentoftheavailabilityconceptbyusingfuzzytheorywithahpcorrectionacasestudybulldozersintheopenpitlignitemine
AT ivanjankovic developmentoftheavailabilityconceptbyusingfuzzytheorywithahpcorrectionacasestudybulldozersintheopenpitlignitemine
AT tomislavsubaranovic developmentoftheavailabilityconceptbyusingfuzzytheorywithahpcorrectionacasestudybulldozersintheopenpitlignitemine
_version_ 1724891551032672256