Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availabi...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2019-10-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/12/21/4044 |
id |
doaj-d6131ea83c44456eb528256c1dbbc8b1 |
---|---|
record_format |
Article |
spelling |
doaj-d6131ea83c44456eb528256c1dbbc8b12020-11-25T02:16:16ZengMDPI AGEnergies1996-10732019-10-011221404410.3390/en12214044en12214044Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite MineStevan Djenadic0Dragan Ignjatovic1Milos Tanasijevic2Ugljesa Bugaric3Ivan Jankovic4Tomislav Subaranovic5Faculty of Mining and Geology, University of Belgrade, 11000 Belgrade, SerbiaFaculty of Mining and Geology, University of Belgrade, 11000 Belgrade, SerbiaFaculty of Mining and Geology, University of Belgrade, 11000 Belgrade, SerbiaFaculty of Mechanical Engineering, University of Belgrade, 11000 Belgrade, SerbiaMinistry of Mining and Energy, 11000 Belgrade, SerbiaFaculty of Mining and Geology, University of Belgrade, 11000 Belgrade, SerbiaAvailability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the coefficient of time use of the machine. This approach is not good enough because it does not go into the structure of the availability itself and requires a high level of IT support in system monitoring. In this sense, this paper will use the fuzzy theory and the corresponding analytic hierarchy process (AHP) multi-criteria analysis to present a conceptual and mathematical model for the assessment of availability based on expert judgment. The model will be shown in the case study (on the example) of bulldozers working in the open-pit lignite mine.https://www.mdpi.com/1996-1073/12/21/4044availabilityfuzzy theoryahp multi-criteria analysisexpert judgmentbulldozer |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Stevan Djenadic Dragan Ignjatovic Milos Tanasijevic Ugljesa Bugaric Ivan Jankovic Tomislav Subaranovic |
spellingShingle |
Stevan Djenadic Dragan Ignjatovic Milos Tanasijevic Ugljesa Bugaric Ivan Jankovic Tomislav Subaranovic Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine Energies availability fuzzy theory ahp multi-criteria analysis expert judgment bulldozer |
author_facet |
Stevan Djenadic Dragan Ignjatovic Milos Tanasijevic Ugljesa Bugaric Ivan Jankovic Tomislav Subaranovic |
author_sort |
Stevan Djenadic |
title |
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine |
title_short |
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine |
title_full |
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine |
title_fullStr |
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine |
title_full_unstemmed |
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine |
title_sort |
development of the availability concept by using fuzzy theory with ahp correction, a case study: bulldozers in the open-pit lignite mine |
publisher |
MDPI AG |
series |
Energies |
issn |
1996-1073 |
publishDate |
2019-10-01 |
description |
Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the coefficient of time use of the machine. This approach is not good enough because it does not go into the structure of the availability itself and requires a high level of IT support in system monitoring. In this sense, this paper will use the fuzzy theory and the corresponding analytic hierarchy process (AHP) multi-criteria analysis to present a conceptual and mathematical model for the assessment of availability based on expert judgment. The model will be shown in the case study (on the example) of bulldozers working in the open-pit lignite mine. |
topic |
availability fuzzy theory ahp multi-criteria analysis expert judgment bulldozer |
url |
https://www.mdpi.com/1996-1073/12/21/4044 |
work_keys_str_mv |
AT stevandjenadic developmentoftheavailabilityconceptbyusingfuzzytheorywithahpcorrectionacasestudybulldozersintheopenpitlignitemine AT draganignjatovic developmentoftheavailabilityconceptbyusingfuzzytheorywithahpcorrectionacasestudybulldozersintheopenpitlignitemine AT milostanasijevic developmentoftheavailabilityconceptbyusingfuzzytheorywithahpcorrectionacasestudybulldozersintheopenpitlignitemine AT ugljesabugaric developmentoftheavailabilityconceptbyusingfuzzytheorywithahpcorrectionacasestudybulldozersintheopenpitlignitemine AT ivanjankovic developmentoftheavailabilityconceptbyusingfuzzytheorywithahpcorrectionacasestudybulldozersintheopenpitlignitemine AT tomislavsubaranovic developmentoftheavailabilityconceptbyusingfuzzytheorywithahpcorrectionacasestudybulldozersintheopenpitlignitemine |
_version_ |
1724891551032672256 |