Measures to reduce construction time of high-rise buildings

The organizational and technological solutions for high-rise buildings construction efficiency increase are considered, primarily – decrease of typical floor construction time and improvement of bearing structures concrete quality. The essence of offered technology is: a concrete mixing station and...

Full description

Bibliographic Details
Main Authors: Kolchedantsev Leonid, Adamtsevich Aleksey, Stupakova Olga, Drozdov Alexander
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:E3S Web of Conferences
Online Access:https://doi.org/10.1051/e3sconf/20183303062
id doaj-d5fde39938d642afae1311244a9e4daa
record_format Article
spelling doaj-d5fde39938d642afae1311244a9e4daa2021-04-02T11:25:17ZengEDP SciencesE3S Web of Conferences2267-12422018-01-01330306210.1051/e3sconf/20183303062e3sconf_hrc2018_03062Measures to reduce construction time of high-rise buildingsKolchedantsev LeonidAdamtsevich AlekseyStupakova OlgaDrozdov AlexanderThe organizational and technological solutions for high-rise buildings construction efficiency increase are considered, primarily – decrease of typical floor construction time and improvement of bearing structures concrete quality. The essence of offered technology is: a concrete mixing station and a polygon mainly for load-bearing wall panels with starter bars casting are located on the building site; for reinforced concrete components manufacturing and butt joints grouting the warmed-up concrete mixtures are used. The results of researches and elaborations carried out by the SPSUACE in area of a preliminary warming-up of concrete mixtures are presented. The possibility and feasibility of their usage in high-rise buildings and of excess height buildings construction including cast-in-place and precast execution are shown. The essence of heat-vibro treating of concrete mixture is revealed as a kind of prior electroresistive curing, and the achieved results are: accelerated concrete strength gain, power inputs decrease, concrete quality improvement. It is shown that the location of a concrete mixing station on the building site enables to broaden possibilities of the “thermos” method use and to avoid concrete mixtures warming up in medium-mass structures erection (columns, girders) during the high-rise buildings construction. It is experimentally proved that the splice between precast elements encased with warmed-up concrete mixture is equal with conjugated elements in strength.https://doi.org/10.1051/e3sconf/20183303062
collection DOAJ
language English
format Article
sources DOAJ
author Kolchedantsev Leonid
Adamtsevich Aleksey
Stupakova Olga
Drozdov Alexander
spellingShingle Kolchedantsev Leonid
Adamtsevich Aleksey
Stupakova Olga
Drozdov Alexander
Measures to reduce construction time of high-rise buildings
E3S Web of Conferences
author_facet Kolchedantsev Leonid
Adamtsevich Aleksey
Stupakova Olga
Drozdov Alexander
author_sort Kolchedantsev Leonid
title Measures to reduce construction time of high-rise buildings
title_short Measures to reduce construction time of high-rise buildings
title_full Measures to reduce construction time of high-rise buildings
title_fullStr Measures to reduce construction time of high-rise buildings
title_full_unstemmed Measures to reduce construction time of high-rise buildings
title_sort measures to reduce construction time of high-rise buildings
publisher EDP Sciences
series E3S Web of Conferences
issn 2267-1242
publishDate 2018-01-01
description The organizational and technological solutions for high-rise buildings construction efficiency increase are considered, primarily – decrease of typical floor construction time and improvement of bearing structures concrete quality. The essence of offered technology is: a concrete mixing station and a polygon mainly for load-bearing wall panels with starter bars casting are located on the building site; for reinforced concrete components manufacturing and butt joints grouting the warmed-up concrete mixtures are used. The results of researches and elaborations carried out by the SPSUACE in area of a preliminary warming-up of concrete mixtures are presented. The possibility and feasibility of their usage in high-rise buildings and of excess height buildings construction including cast-in-place and precast execution are shown. The essence of heat-vibro treating of concrete mixture is revealed as a kind of prior electroresistive curing, and the achieved results are: accelerated concrete strength gain, power inputs decrease, concrete quality improvement. It is shown that the location of a concrete mixing station on the building site enables to broaden possibilities of the “thermos” method use and to avoid concrete mixtures warming up in medium-mass structures erection (columns, girders) during the high-rise buildings construction. It is experimentally proved that the splice between precast elements encased with warmed-up concrete mixture is equal with conjugated elements in strength.
url https://doi.org/10.1051/e3sconf/20183303062
work_keys_str_mv AT kolchedantsevleonid measurestoreduceconstructiontimeofhighrisebuildings
AT adamtsevichaleksey measurestoreduceconstructiontimeofhighrisebuildings
AT stupakovaolga measurestoreduceconstructiontimeofhighrisebuildings
AT drozdovalexander measurestoreduceconstructiontimeofhighrisebuildings
_version_ 1724164856266883072