Measures to reduce construction time of high-rise buildings
The organizational and technological solutions for high-rise buildings construction efficiency increase are considered, primarily – decrease of typical floor construction time and improvement of bearing structures concrete quality. The essence of offered technology is: a concrete mixing station and...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://doi.org/10.1051/e3sconf/20183303062 |
id |
doaj-d5fde39938d642afae1311244a9e4daa |
---|---|
record_format |
Article |
spelling |
doaj-d5fde39938d642afae1311244a9e4daa2021-04-02T11:25:17ZengEDP SciencesE3S Web of Conferences2267-12422018-01-01330306210.1051/e3sconf/20183303062e3sconf_hrc2018_03062Measures to reduce construction time of high-rise buildingsKolchedantsev LeonidAdamtsevich AlekseyStupakova OlgaDrozdov AlexanderThe organizational and technological solutions for high-rise buildings construction efficiency increase are considered, primarily – decrease of typical floor construction time and improvement of bearing structures concrete quality. The essence of offered technology is: a concrete mixing station and a polygon mainly for load-bearing wall panels with starter bars casting are located on the building site; for reinforced concrete components manufacturing and butt joints grouting the warmed-up concrete mixtures are used. The results of researches and elaborations carried out by the SPSUACE in area of a preliminary warming-up of concrete mixtures are presented. The possibility and feasibility of their usage in high-rise buildings and of excess height buildings construction including cast-in-place and precast execution are shown. The essence of heat-vibro treating of concrete mixture is revealed as a kind of prior electroresistive curing, and the achieved results are: accelerated concrete strength gain, power inputs decrease, concrete quality improvement. It is shown that the location of a concrete mixing station on the building site enables to broaden possibilities of the “thermos” method use and to avoid concrete mixtures warming up in medium-mass structures erection (columns, girders) during the high-rise buildings construction. It is experimentally proved that the splice between precast elements encased with warmed-up concrete mixture is equal with conjugated elements in strength.https://doi.org/10.1051/e3sconf/20183303062 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Kolchedantsev Leonid Adamtsevich Aleksey Stupakova Olga Drozdov Alexander |
spellingShingle |
Kolchedantsev Leonid Adamtsevich Aleksey Stupakova Olga Drozdov Alexander Measures to reduce construction time of high-rise buildings E3S Web of Conferences |
author_facet |
Kolchedantsev Leonid Adamtsevich Aleksey Stupakova Olga Drozdov Alexander |
author_sort |
Kolchedantsev Leonid |
title |
Measures to reduce construction time of high-rise buildings |
title_short |
Measures to reduce construction time of high-rise buildings |
title_full |
Measures to reduce construction time of high-rise buildings |
title_fullStr |
Measures to reduce construction time of high-rise buildings |
title_full_unstemmed |
Measures to reduce construction time of high-rise buildings |
title_sort |
measures to reduce construction time of high-rise buildings |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2018-01-01 |
description |
The organizational and technological solutions for high-rise buildings construction efficiency increase are considered, primarily – decrease of typical floor construction time and improvement of bearing structures concrete quality. The essence of offered technology is: a concrete mixing station and a polygon mainly for load-bearing wall panels with starter bars casting are located on the building site; for reinforced concrete components manufacturing and butt joints grouting the warmed-up concrete mixtures are used. The results of researches and elaborations carried out by the SPSUACE in area of a preliminary warming-up of concrete mixtures are presented. The possibility and feasibility of their usage in high-rise buildings and of excess height buildings construction including cast-in-place and precast execution are shown. The essence of heat-vibro treating of concrete mixture is revealed as a kind of prior electroresistive curing, and the achieved results are: accelerated concrete strength gain, power inputs decrease, concrete quality improvement. It is shown that the location of a concrete mixing station on the building site enables to broaden possibilities of the “thermos” method use and to avoid concrete mixtures warming up in medium-mass structures erection (columns, girders) during the high-rise buildings construction. It is experimentally proved that the splice between precast elements encased with warmed-up concrete mixture is equal with conjugated elements in strength. |
url |
https://doi.org/10.1051/e3sconf/20183303062 |
work_keys_str_mv |
AT kolchedantsevleonid measurestoreduceconstructiontimeofhighrisebuildings AT adamtsevichaleksey measurestoreduceconstructiontimeofhighrisebuildings AT stupakovaolga measurestoreduceconstructiontimeofhighrisebuildings AT drozdovalexander measurestoreduceconstructiontimeofhighrisebuildings |
_version_ |
1724164856266883072 |