Concurrent operation of 10 gyrotrons at W7-X experience and improvement opportunities
At the stellarator Wendelstein 7-X (W7-X) Electron Cyclotron Resonance Heating (ECRH) is the main heating system for steady-state operation and was the only available heating system during the operation phase OP1.2a in 2017. The ECRH, equipped with 10 operational 140 GHz gyrotrons [1], was used for...
Main Authors: | Braune H., Brunner K.J., Laqua H.P., Marsen S., Moseev D., Noke F., Purps F., Schneider N., Schulz T., Stange T., Uhren P., Wilde F. |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | EPJ Web of Conferences |
Online Access: | https://doi.org/10.1051/epjconf/201818701003 |
Similar Items
-
Continuous high power microwave heating at the W7-X stellarator
by: Brunner K.J., et al.
Published: (2017-01-01) -
Overview of W7-X ECRH Results
by: Laqua H.P., et al.
Published: (2019-01-01) -
Overview of W7-X ECRH Results in OP1.2a
by: Laqua H.P., et al.
Published: (2018-01-01) -
Optics for electron cyclotron resonance heating and collective Thomson scattering at the stellarator W7-X
by: Kasparek W., et al.
Published: (2017-01-01) -
Experimental investigation of the ECRH stray radiation during the start-up phase in Wendelstein 7-X
by: Moseev Dmitry, et al.
Published: (2017-01-01)