A Two-Stage Stochastic Model for Maintenance and Rehabilitation Planning of Pavements

Pavement maintenance and rehabilitation (M&R) plan for maintaining the pavement quality in an acceptable level has direct influence on the required budget. Deterministic budgeting is an unrealistic assumption, so, in this study, a two-stage stochastic model using integer programming is developed...

Full description

Bibliographic Details
Main Authors: Mahmoud Ameri, Armin Jarrahi, Farshad Haddadi, Mohammad Hasan Mirabimoghaddam
Format: Article
Language:English
Published: Hindawi Limited 2019-01-01
Series:Mathematical Problems in Engineering
Online Access:http://dx.doi.org/10.1155/2019/3971791
Description
Summary:Pavement maintenance and rehabilitation (M&R) plan for maintaining the pavement quality in an acceptable level has direct influence on the required budget. Deterministic budgeting is an unrealistic assumption, so, in this study, a two-stage stochastic model using integer programming is developed to address uncertainty in budgeting. Another aim of this study is to develop an executive model that considers a broad range of parameters at network level maintenance and rehabilitation planning. While having too many details in planning problems makes them more complicated, some restrictions called “technical constraints” were considered to reduce solution time of solving procedure as well as improve M&R activities assignment efficiency. Comparing results of the stochastic model with a deterministic model for a case study revealed that the two-stage stochastic model led to increased total cost compared to the deterministic one due to considering probability in budgeting. However, the developed model provides several M&R plans that are compatible with budget variation.
ISSN:1024-123X
1563-5147