Minimizing makespan in a three-stage hybrid flow shop with dedicated machines
In recent years, many studies on scheduling problems with dedicated machines have been carried out. But, few of them have considered the case of more than two stages. This paper aims at filling this gap by addressing the three-stage hybrid flow shop scheduling problem with two dedicated machines in...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2018-10-01
|
Series: | International Journal of Industrial Engineering Computations |
Subjects: | |
Online Access: | http://www.growingscience.com/ijiec/Vol10/IJIEC_2018_19.pdf |