Planning Supplies in the Enterprise in the Aspect of Reliability
The article presents the example of material needs planning (MRP) methodology in a production company. The example assumes the production technology of three independent products A, B and C exhibiting structural modularity. For calculations, a methodology should be developed for describing products...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2020-12-01
|
Series: | Journal of KONBiN |
Subjects: | |
Online Access: | https://doi.org/10.2478/jok-2020-0085 |
id |
doaj-d032de6f5cdd4e48942373af6983c356 |
---|---|
record_format |
Article |
spelling |
doaj-d032de6f5cdd4e48942373af6983c3562021-09-06T19:41:45ZengSciendoJournal of KONBiN2083-46082020-12-0150425126810.2478/jok-2020-0085jok-2020-0085Planning Supplies in the Enterprise in the Aspect of ReliabilityZiółkowski Jarosław0Żurek Józef1Lęgas Aleksandra2Szkutnik-Rogoż Joanna3Oszczypała Mateusz4Dobrzyński Krzysztof5Military University of TechnologyAir Force Institute of TechnologyMilitary University of TechnologyMilitary University of TechnologyMilitary University of TechnologyMilitary University of TechnologyThe article presents the example of material needs planning (MRP) methodology in a production company. The example assumes the production technology of three independent products A, B and C exhibiting structural modularity. For calculations, a methodology should be developed for describing products with such a structure that reflects the relationships of individual components used to prepare a delivery schedule. The Microsoft Excel spreadsheet was used as the calculation tool.https://doi.org/10.2478/jok-2020-0085reliabilitydelivery schedulingproduct structureplanning |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Ziółkowski Jarosław Żurek Józef Lęgas Aleksandra Szkutnik-Rogoż Joanna Oszczypała Mateusz Dobrzyński Krzysztof |
spellingShingle |
Ziółkowski Jarosław Żurek Józef Lęgas Aleksandra Szkutnik-Rogoż Joanna Oszczypała Mateusz Dobrzyński Krzysztof Planning Supplies in the Enterprise in the Aspect of Reliability Journal of KONBiN reliability delivery scheduling product structure planning |
author_facet |
Ziółkowski Jarosław Żurek Józef Lęgas Aleksandra Szkutnik-Rogoż Joanna Oszczypała Mateusz Dobrzyński Krzysztof |
author_sort |
Ziółkowski Jarosław |
title |
Planning Supplies in the Enterprise in the Aspect of Reliability |
title_short |
Planning Supplies in the Enterprise in the Aspect of Reliability |
title_full |
Planning Supplies in the Enterprise in the Aspect of Reliability |
title_fullStr |
Planning Supplies in the Enterprise in the Aspect of Reliability |
title_full_unstemmed |
Planning Supplies in the Enterprise in the Aspect of Reliability |
title_sort |
planning supplies in the enterprise in the aspect of reliability |
publisher |
Sciendo |
series |
Journal of KONBiN |
issn |
2083-4608 |
publishDate |
2020-12-01 |
description |
The article presents the example of material needs planning (MRP) methodology in a production company. The example assumes the production technology of three independent products A, B and C exhibiting structural modularity. For calculations, a methodology should be developed for describing products with such a structure that reflects the relationships of individual components used to prepare a delivery schedule. The Microsoft Excel spreadsheet was used as the calculation tool. |
topic |
reliability delivery scheduling product structure planning |
url |
https://doi.org/10.2478/jok-2020-0085 |
work_keys_str_mv |
AT ziołkowskijarosław planningsuppliesintheenterpriseintheaspectofreliability AT zurekjozef planningsuppliesintheenterpriseintheaspectofreliability AT legasaleksandra planningsuppliesintheenterpriseintheaspectofreliability AT szkutnikrogozjoanna planningsuppliesintheenterpriseintheaspectofreliability AT oszczypałamateusz planningsuppliesintheenterpriseintheaspectofreliability AT dobrzynskikrzysztof planningsuppliesintheenterpriseintheaspectofreliability |
_version_ |
1717765500214181888 |