Planning Supplies in the Enterprise in the Aspect of Reliability

The article presents the example of material needs planning (MRP) methodology in a production company. The example assumes the production technology of three independent products A, B and C exhibiting structural modularity. For calculations, a methodology should be developed for describing products...

Full description

Bibliographic Details
Main Authors: Ziółkowski Jarosław, Żurek Józef, Lęgas Aleksandra, Szkutnik-Rogoż Joanna, Oszczypała Mateusz, Dobrzyński Krzysztof
Format: Article
Language:English
Published: Sciendo 2020-12-01
Series:Journal of KONBiN
Subjects:
Online Access:https://doi.org/10.2478/jok-2020-0085
Description
Summary:The article presents the example of material needs planning (MRP) methodology in a production company. The example assumes the production technology of three independent products A, B and C exhibiting structural modularity. For calculations, a methodology should be developed for describing products with such a structure that reflects the relationships of individual components used to prepare a delivery schedule. The Microsoft Excel spreadsheet was used as the calculation tool.
ISSN:2083-4608