Problem with Objectives of Minimizing Resource Costs and Minimizing Project Completion Time
A Resource Investment Problem is a project scheduling problem recently considered. In this issue, in contrast with other project scheduling, the project availability of needed resources level is considered decision variable and the goal is to find a schedule and resource requirement level. Researche...
Main Authors: | mohammad najafi, Faramarz shamsnatari, amir abas najafii |
---|---|
Format: | Article |
Language: | fas |
Published: |
Allameh Tabataba'i University Press
2013-07-01
|
Series: | Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī |
Online Access: | http://jims.atu.ac.ir/article_1247_bb9e884eb2e421890df47c43a41174ca.pdf |
Similar Items
-
Minimizing the total completion time in the relocation problem with separate resource recycling operations
by: Tsai, Min-Han, et al.
Published: (2014) -
Resource Tardiness Weighted Cost Minimization in Project Scheduling
by: Ali Shirzadeh Chaleshtari
Published: (2017-01-01) -
Minimizing the Total Weighted Completion Time in Resource-constrained Scheduling
by: Chuang, Ying-Ting, et al.
Published: (2015) -
Corrigendum to “Resource Tardiness Weighted Cost Minimization in Project Scheduling”
by: Ali Shirzadeh Chaleshtari
Published: (2017-01-01) -
Minimizing Total Resource Tardiness Penalty Costs in the Resource Constrained Project Scheduling Problem with Metaheuristic Algorithms
by: R. Golestaneh, et al.
Published: (2013-09-01)