Abstract The long gestation period, high upfront costs and the risks in the development of central geothermal power plants are the main reasons for the slow rate of geothermal electricity growth and its contribution to the global electricity mix. The overall objective of this study was to make a com...
Main Authors: | Moses Jeremiah Barasa Kabeyi, Oludolapo A. Olanrewaju |
---|---|
Format: | Article |
Language: | English |
Published: |
BMC
2021-03-01
|
Series: | Energy, Sustainability and Society |
Subjects: | |
Online Access: | https://doi.org/10.1186/s13705-021-00283-8 |
Similar Items
-
The state of exploitation of geothermal energy and some interesting achievements in geothermal research and development in the world
by: Dušan Rajver, et al.
Published: (2016-08-01) -
Pedagogical development and technical research in the area of geothermal power production
by: Denbow, Christopher
Published: (2011) -
Geological and Thermodynamic Analysis of Low Enthalpy Geothermal Resources to Electricity Generation Using ORC and Kalina Cycle Technology
by: Michał Kaczmarczyk, et al.
Published: (2020-03-01) -
Defining the maximum performance of the gas turbine
by: Bondor Károly, et al.
Published: (2008-05-01) -
Orthogonal Test Analysis on Conditions Affecting Electricity Generation Performance of an Enhanced Geothermal System at Yangbajing Geothermal Field
by: Yuchao Zeng, et al.
Published: (2017-12-01)