Law and countermeasures for the casing damage of oil production wells and water injection wells in Tarim Oilfield
Based on the analyses of the situation and distribution of casing damage in the Tarim Oilfield, it was considered that there are six major factors causing the casing damage: (1) There are flowing rock or highly permeable formation around the casing; (2) The well bore structure is unreasonable; (3) T...
Main Authors: | , , , , , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
KeAi Communications Co., Ltd.
2011-06-01
|
Series: | Petroleum Exploration and Development |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1876380411600384 |
id |
doaj-cde51580dad34e07bc18a221e37debb7 |
---|---|
record_format |
Article |
spelling |
doaj-cde51580dad34e07bc18a221e37debb72021-02-02T05:29:50ZengKeAi Communications Co., Ltd.Petroleum Exploration and Development1876-38042011-06-01383352361Law and countermeasures for the casing damage of oil production wells and water injection wells in Tarim OilfieldWang Tao0Yang Shenglai1Zhu Weihong2Bian Wanjiang3Liu Min4Lei Yu5Zhang Yuan6Zhang Jin7Zhao Wei8Chen Lan9Zhou Xiaoping10Liao Jianhua11Petroleum and Gas Engineering College, China University of Petroleum, Beijing 102249, China; Research Institute of Petroleum Exploration and Development, PetroChina Tarim Oilfiled Company, Korla 841000, China; Corresponding authorPetroleum and Gas Engineering College, China University of Petroleum, Beijing 102249, ChinaDevelopment Bussiness Department of PetroChina Tarim Oilfield Company, Korla 841000, ChinaResearch Institute of Petroleum Exploration and Development, PetroChina Tarim Oilfiled Company, Korla 841000, ChinaDevelopment Bussiness Department of PetroChina Tarim Oilfield Company, Korla 841000, ChinaExploration and Development Department, PetroChina Tarim Oilfiled Company, Korla 841000, ChinaTechnology Development Department, PetroChina Tarim Oilfiled Company, Korla 841000, ChinaResearch Institute of Petroleum Exploration and Development, PetroChina Southwest Oil & Gas Company, Chengdu 610500, ChinaResearch Institute of Petroleum Exploration and Development, PetroChina Tarim Oilfiled Company, Korla 841000, ChinaDevelopment Bussiness Department of PetroChina Tarim Oilfield Company, Korla 841000, ChinaDevelopment Bussiness Department of PetroChina Tarim Oilfield Company, Korla 841000, ChinaDevelopment Bussiness Department of PetroChina Tarim Oilfield Company, Korla 841000, ChinaBased on the analyses of the situation and distribution of casing damage in the Tarim Oilfield, it was considered that there are six major factors causing the casing damage: (1) There are flowing rock or highly permeable formation around the casing; (2) The well bore structure is unreasonable; (3) The up hole elevation of cement in the drilling design is not high enough, or the cementing quality does not conform to the rules; (4) The quality of casing grading hoop is not up to the required standard; (5) Collapse resistance decreased due to the corrosion, wear, and special down hole operation; (6) The unreasonable development factors. According to the present situation of the casing damage, the comprehensive countermeasures of “defense”, “diagnosis”, “treatment” for repairing the casing-damaged wells were developed. For the casing-damaged wells, 3 ways, taking underground work sit sealing to suppress, engineering logging and static temperature gradient, were used to find a leakage. During 1998-2009, casing damages happened in 71 wells, and 87 places were damaged in total. After determining the position of the casing damages, 3 ways were employed to repair the casing-damaged wells, cement squeezing, using packer to the selected segment, tube expanding subsidies. Fifty-seven casing-damaged wells were repaired, of which, 46 wells were recovered on production. The success ratio is 80.70%. Key words: Tarim Oilfield, development, casing-damaged well, distribution of casing damage, casing damage prevention, countermeasurehttp://www.sciencedirect.com/science/article/pii/S1876380411600384 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Wang Tao Yang Shenglai Zhu Weihong Bian Wanjiang Liu Min Lei Yu Zhang Yuan Zhang Jin Zhao Wei Chen Lan Zhou Xiaoping Liao Jianhua |
spellingShingle |
Wang Tao Yang Shenglai Zhu Weihong Bian Wanjiang Liu Min Lei Yu Zhang Yuan Zhang Jin Zhao Wei Chen Lan Zhou Xiaoping Liao Jianhua Law and countermeasures for the casing damage of oil production wells and water injection wells in Tarim Oilfield Petroleum Exploration and Development |
author_facet |
Wang Tao Yang Shenglai Zhu Weihong Bian Wanjiang Liu Min Lei Yu Zhang Yuan Zhang Jin Zhao Wei Chen Lan Zhou Xiaoping Liao Jianhua |
author_sort |
Wang Tao |
title |
Law and countermeasures for the casing damage of oil production wells and water injection wells in Tarim Oilfield |
title_short |
Law and countermeasures for the casing damage of oil production wells and water injection wells in Tarim Oilfield |
title_full |
Law and countermeasures for the casing damage of oil production wells and water injection wells in Tarim Oilfield |
title_fullStr |
Law and countermeasures for the casing damage of oil production wells and water injection wells in Tarim Oilfield |
title_full_unstemmed |
Law and countermeasures for the casing damage of oil production wells and water injection wells in Tarim Oilfield |
title_sort |
law and countermeasures for the casing damage of oil production wells and water injection wells in tarim oilfield |
publisher |
KeAi Communications Co., Ltd. |
series |
Petroleum Exploration and Development |
issn |
1876-3804 |
publishDate |
2011-06-01 |
description |
Based on the analyses of the situation and distribution of casing damage in the Tarim Oilfield, it was considered that there are six major factors causing the casing damage: (1) There are flowing rock or highly permeable formation around the casing; (2) The well bore structure is unreasonable; (3) The up hole elevation of cement in the drilling design is not high enough, or the cementing quality does not conform to the rules; (4) The quality of casing grading hoop is not up to the required standard; (5) Collapse resistance decreased due to the corrosion, wear, and special down hole operation; (6) The unreasonable development factors. According to the present situation of the casing damage, the comprehensive countermeasures of “defense”, “diagnosis”, “treatment” for repairing the casing-damaged wells were developed. For the casing-damaged wells, 3 ways, taking underground work sit sealing to suppress, engineering logging and static temperature gradient, were used to find a leakage. During 1998-2009, casing damages happened in 71 wells, and 87 places were damaged in total. After determining the position of the casing damages, 3 ways were employed to repair the casing-damaged wells, cement squeezing, using packer to the selected segment, tube expanding subsidies. Fifty-seven casing-damaged wells were repaired, of which, 46 wells were recovered on production. The success ratio is 80.70%. Key words: Tarim Oilfield, development, casing-damaged well, distribution of casing damage, casing damage prevention, countermeasure |
url |
http://www.sciencedirect.com/science/article/pii/S1876380411600384 |
work_keys_str_mv |
AT wangtao lawandcountermeasuresforthecasingdamageofoilproductionwellsandwaterinjectionwellsintarimoilfield AT yangshenglai lawandcountermeasuresforthecasingdamageofoilproductionwellsandwaterinjectionwellsintarimoilfield AT zhuweihong lawandcountermeasuresforthecasingdamageofoilproductionwellsandwaterinjectionwellsintarimoilfield AT bianwanjiang lawandcountermeasuresforthecasingdamageofoilproductionwellsandwaterinjectionwellsintarimoilfield AT liumin lawandcountermeasuresforthecasingdamageofoilproductionwellsandwaterinjectionwellsintarimoilfield AT leiyu lawandcountermeasuresforthecasingdamageofoilproductionwellsandwaterinjectionwellsintarimoilfield AT zhangyuan lawandcountermeasuresforthecasingdamageofoilproductionwellsandwaterinjectionwellsintarimoilfield AT zhangjin lawandcountermeasuresforthecasingdamageofoilproductionwellsandwaterinjectionwellsintarimoilfield AT zhaowei lawandcountermeasuresforthecasingdamageofoilproductionwellsandwaterinjectionwellsintarimoilfield AT chenlan lawandcountermeasuresforthecasingdamageofoilproductionwellsandwaterinjectionwellsintarimoilfield AT zhouxiaoping lawandcountermeasuresforthecasingdamageofoilproductionwellsandwaterinjectionwellsintarimoilfield AT liaojianhua lawandcountermeasuresforthecasingdamageofoilproductionwellsandwaterinjectionwellsintarimoilfield |
_version_ |
1724303654689701888 |