About the effectiveness of counter blasting with chamber mining system
When underground mining of Ural copper deposits with a chamber mining system, an urgent scientific and practical task is to increase the productivity of loadingdelivery machines for the ore drawing from secondary chambers. The technogenic disturbance of the massif of such chambers in combination wit...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2020-01-01
|
Series: | E3S Web of Conferences |
Subjects: | |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/52/e3sconf_pcdg2020_01017.pdf |
id |
doaj-cd1f4dd76e624631beddbabe9c87ff32 |
---|---|
record_format |
Article |
spelling |
doaj-cd1f4dd76e624631beddbabe9c87ff322021-04-02T13:06:51ZengEDP SciencesE3S Web of Conferences2267-12422020-01-011920101710.1051/e3sconf/202019201017e3sconf_pcdg2020_01017About the effectiveness of counter blasting with chamber mining systemSokolov Igor0Antipin Yuri1Baranovsky Kirill2Rozhkov Artem3Institute of Mining of the Ural branch of the Russian Academy of Sciences, Laboratory of Underground GeotechnologyInstitute of Mining of the Ural branch of the Russian Academy of Sciences, Laboratory of Underground GeotechnologyInstitute of Mining of the Ural branch of the Russian Academy of Sciences, Laboratory of Underground GeotechnologyInstitute of Mining of the Ural branch of the Russian Academy of Sciences, Laboratory of Underground GeotechnologyWhen underground mining of Ural copper deposits with a chamber mining system, an urgent scientific and practical task is to increase the productivity of loadingdelivery machines for the ore drawing from secondary chambers. The technogenic disturbance of the massif of such chambers in combination with the non-alternative use of a blasthole ring scheme of breaking leads to an increased output of oversized fractions. With an increase of oversized ore output, operating costs for the drawing and delivery of ore increase, tire wear, fuel and lubricants consumption increases. In this article, the possibility of reducing the oversize ore output in secondary chambers by using counter blasting of the breaking layers is considered. As a result of the research, the parameters of effective counter blasting with blasthole ring charges were established, namely, the distance between the working faces in the chamber, the angle of ore pieces meeting and the line of least resistance.https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/52/e3sconf_pcdg2020_01017.pdfcopper orecounter blastingoversized oreblasthole ring chargesline of least resistance |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Sokolov Igor Antipin Yuri Baranovsky Kirill Rozhkov Artem |
spellingShingle |
Sokolov Igor Antipin Yuri Baranovsky Kirill Rozhkov Artem About the effectiveness of counter blasting with chamber mining system E3S Web of Conferences copper ore counter blasting oversized ore blasthole ring charges line of least resistance |
author_facet |
Sokolov Igor Antipin Yuri Baranovsky Kirill Rozhkov Artem |
author_sort |
Sokolov Igor |
title |
About the effectiveness of counter blasting with chamber mining system |
title_short |
About the effectiveness of counter blasting with chamber mining system |
title_full |
About the effectiveness of counter blasting with chamber mining system |
title_fullStr |
About the effectiveness of counter blasting with chamber mining system |
title_full_unstemmed |
About the effectiveness of counter blasting with chamber mining system |
title_sort |
about the effectiveness of counter blasting with chamber mining system |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2020-01-01 |
description |
When underground mining of Ural copper deposits with a chamber mining system, an urgent scientific and practical task is to increase the productivity of loadingdelivery machines for the ore drawing from secondary chambers. The technogenic disturbance of the massif of such chambers in combination with the non-alternative use of a blasthole ring scheme of breaking leads to an increased output of oversized fractions. With an increase of oversized ore output, operating costs for the drawing and delivery of ore increase, tire wear, fuel and lubricants consumption increases. In this article, the possibility of reducing the oversize ore output in secondary chambers by using counter blasting of the breaking layers is considered. As a result of the research, the parameters of effective counter blasting with blasthole ring charges were established, namely, the distance between the working faces in the chamber, the angle of ore pieces meeting and the line of least resistance. |
topic |
copper ore counter blasting oversized ore blasthole ring charges line of least resistance |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/52/e3sconf_pcdg2020_01017.pdf |
work_keys_str_mv |
AT sokolovigor abouttheeffectivenessofcounterblastingwithchamberminingsystem AT antipinyuri abouttheeffectivenessofcounterblastingwithchamberminingsystem AT baranovskykirill abouttheeffectivenessofcounterblastingwithchamberminingsystem AT rozhkovartem abouttheeffectivenessofcounterblastingwithchamberminingsystem |
_version_ |
1721566484223754240 |