Stochastic Procurement of Fast Reserve Services in Renewable Integrated Power Systems
Ensuring the security and quality of supply in a power system after a contingency event is one of the most challenging tasks for an electricity system operator. This work is initiated by this challenge and proposes a solution based on the use of provided reserves by fast generators, storage devices,...
Main Authors: | Mahdi Habibi, Vahid Vahidinasab, Mohammad Sadegh Sepasian, Adib Allahham, Damian Giaouris, Phil Taylor, Jamshid Aghaei |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2021-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/9352722/ |
Similar Items
-
Ensuring the Reliable Operation of the Power Grid: State-Based and Distributed Approaches to Scheduling Energy and Contingency Reserves
by: Prada, Jose Fernando
Published: (2017) -
Security-constrained model for integrated power and natural-gas system
by: Carlos M. CORREA-POSADA, et al.
Published: (2017-04-01) -
Contingency-constrained unit commitment with post-contingency corrective recourse
by: Chen, Richard Li-Yang, et al.
Published: (2014) -
Network-Constrained Unit Commitment Based on Reserve Models Fully Considering the Stochastic Characteristics of Wind Power
by: Gang Wang, et al.
Published: (2018-02-01) -
Incorporating Concentrating Solar Power into High Renewables Penetrated Power System: A Chance-Constrained Stochastic Unit Commitment Analysis
by: Shan Gao, et al.
Published: (2019-06-01)