Research on hot air ice melt system for cable sheaths of Er’qi Yangtze River Bridge
To prevent the cable sheaths of Er’qi Yangtze River Bridge from freezing under bad weather in winter, which may lead to ice fall and bring traffic safety accidents, a theoretical model and technical scheme of hot air ice melt system for Er’qi Yangtze River Bridge has been proposed. Based on the esta...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/13/e3sconf_arfee2021_02006.pdf |
id |
doaj-cad2a61714224d57b01d03992a0eb518 |
---|---|
record_format |
Article |
spelling |
doaj-cad2a61714224d57b01d03992a0eb5182021-02-18T10:43:33ZengEDP SciencesE3S Web of Conferences2267-12422021-01-012370200610.1051/e3sconf/202123702006e3sconf_arfee2021_02006Research on hot air ice melt system for cable sheaths of Er’qi Yangtze River BridgeLiu Qianqian0Han yongtao1Fan xueliang2China Railway Wuhan Survey and Design Co., Ltd.China Railway Wuhan Survey and Design Co., Ltd.China Railway Wuhan Survey and Design Co., Ltd.To prevent the cable sheaths of Er’qi Yangtze River Bridge from freezing under bad weather in winter, which may lead to ice fall and bring traffic safety accidents, a theoretical model and technical scheme of hot air ice melt system for Er’qi Yangtze River Bridge has been proposed. Based on the established heat transfer model for cable sheaths, the characteristics of heat transfer between internal hot air and outdoor environment have been analyzed. Under the condition when the temperature of the end of cable sheath’s outwall is more than 3°C, the range of temperature and speed of input hot air were estimated, which provides a theoretical basis for hot air melt system for cable-stayed bridge sheaths.https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/13/e3sconf_arfee2021_02006.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Liu Qianqian Han yongtao Fan xueliang |
spellingShingle |
Liu Qianqian Han yongtao Fan xueliang Research on hot air ice melt system for cable sheaths of Er’qi Yangtze River Bridge E3S Web of Conferences |
author_facet |
Liu Qianqian Han yongtao Fan xueliang |
author_sort |
Liu Qianqian |
title |
Research on hot air ice melt system for cable sheaths of Er’qi Yangtze River Bridge |
title_short |
Research on hot air ice melt system for cable sheaths of Er’qi Yangtze River Bridge |
title_full |
Research on hot air ice melt system for cable sheaths of Er’qi Yangtze River Bridge |
title_fullStr |
Research on hot air ice melt system for cable sheaths of Er’qi Yangtze River Bridge |
title_full_unstemmed |
Research on hot air ice melt system for cable sheaths of Er’qi Yangtze River Bridge |
title_sort |
research on hot air ice melt system for cable sheaths of er’qi yangtze river bridge |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2021-01-01 |
description |
To prevent the cable sheaths of Er’qi Yangtze River Bridge from freezing under bad weather in winter, which may lead to ice fall and bring traffic safety accidents, a theoretical model and technical scheme of hot air ice melt system for Er’qi Yangtze River Bridge has been proposed. Based on the established heat transfer model for cable sheaths, the characteristics of heat transfer between internal hot air and outdoor environment have been analyzed. Under the condition when the temperature of the end of cable sheath’s outwall is more than 3°C, the range of temperature and speed of input hot air were estimated, which provides a theoretical basis for hot air melt system for cable-stayed bridge sheaths. |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/13/e3sconf_arfee2021_02006.pdf |
work_keys_str_mv |
AT liuqianqian researchonhotairicemeltsystemforcablesheathsoferqiyangtzeriverbridge AT hanyongtao researchonhotairicemeltsystemforcablesheathsoferqiyangtzeriverbridge AT fanxueliang researchonhotairicemeltsystemforcablesheathsoferqiyangtzeriverbridge |
_version_ |
1724263257786548224 |