Sub-activity Time-Cost Trade-off Model of Building Structural Beam on the Projects in the North Aceh Region
Problems for both delayed and accelerated activities in scheduling are common in most projects. This problem can implicate on the additional construction cost with different trends as a specific model. A model can provide valuable information to project acceleration judgement. This research aims to...
Main Authors: | Fachrurrazi Fachrurrazi, Abdullah Abdullah, Yuwaldi Away, Teuku Budi Aulia |
---|---|
Format: | Article |
Language: | English |
Published: |
Syiah Kuala University
2019-08-01
|
Series: | Aceh International Journal of Science and Technology |
Subjects: | |
Online Access: | http://jurnal.unsyiah.ac.id/AIJST/article/view/13218 |
Similar Items
-
TIME-COST TRADE-OFF MODEL FOR TIE BEAM ACTIVITY
by: Fachrurrazi Fachrurrazi, et al.
Published: (2018-05-01) -
Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity
by: Fachrurrazi Fachrurrazi, et al.
Published: (2018-01-01) -
Stress Intensity Factor of Reinforced Concrete Beams in Bending
by: Zhmagul Smagulovich Nuguzhinov, et al.
Published: (2021-07-01) -
Analisis Pertukaran Waktu dan Biaya Menggunakan Metode Time Cost Trade Off (TCTO) pada Proyek Pembangunan Perumahan di PT. X
by: Nailul Izzah
Published: (2018-02-01) -
The study through models of reinforced concrete beams failing in shear.
by: Finch, John David.
Published: (1968)