Process organization design within the framework of construction projects ОРГАНИЗАЦИОННО-ТЕХНОЛОГИЧЕСКОЕ ПРОЕКТИРОВАНИЕПРИ РЕАЛИЗАЦИИ ИНВЕСТИЦИОННО-СТРОИТЕЛЬНЫХ ПРОЕКТОВ
The author describes the current practice of scheduling and organization of the work performance in the construction industry, which has assimilated the most advanced international standards. Any construction project contemplates a need to manage an extensive number of flows of information and mater...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Moscow State University of Civil Engineering (MGSU)
2013-05-01
|
Series: | Vestnik MGSU |
Subjects: | |
Online Access: | http://vestnikmgsu.ru/files/archive/RUS/issuepage/2013/5/22.pdf |
id |
doaj-c98b0ab663b5456d902784152ff051f2 |
---|---|
record_format |
Article |
spelling |
doaj-c98b0ab663b5456d902784152ff051f22020-11-25T00:34:30ZengMoscow State University of Civil Engineering (MGSU)Vestnik MGSU 1997-09352304-66002013-05-015176184Process organization design within the framework of construction projects ОРГАНИЗАЦИОННО-ТЕХНОЛОГИЧЕСКОЕ ПРОЕКТИРОВАНИЕПРИ РЕАЛИЗАЦИИ ИНВЕСТИЦИОННО-СТРОИТЕЛЬНЫХ ПРОЕКТОВZharov Yaroslav VladimirovichThe author describes the current practice of scheduling and organization of the work performance in the construction industry, which has assimilated the most advanced international standards. Any construction project contemplates a need to manage an extensive number of flows of information and material resources. Each of them is characterized by different values of intensity, versatile directions and scopes of work. Therefore, the author believes that a multi-level approach to scheduling of construction projects may intensify construction operations. It means that the whole range of scheduling actions shall apply to each level of the hierarchy of construction operations.In terms of long-term and medium-term planning, there is a need to formulate and approve a plan for attainment of key technology-related objectives throughout the entire period of construction works. Annual planning is necessary to outline the roadmap for implementation of annual delivery plans in accordance with the pre-set technological and economic parameters, to ensure timely commissioning of facilities under construction and efficient management of human and material resources. Quarterly schedules are to clarify the structure of an annual schedule, while monthly and weekly scheduling is primarily to clarify relevant sections of the annual plan in case of its alteration caused by changes in the project status.<br>Рассмотрена существующая практика планирования и организации в строительстве, являющаяся в настоящее время наиболее прогрессивной и соответствующая мировым стандартам в этой сфере. Необходимость управления большим количеством различных по интенсивности, направлению, объему, схемам прохождения информационных, материально-технических потоков, а также потоков регулирующих воздействий со стороны организатора строительства указывает на целесообразность использования многоуровнего подхода в планировании реализации инвестиционно-строительных проектов с целью повышения эффективности и интенсификации строительного производства.http://vestnikmgsu.ru/files/archive/RUS/issuepage/2013/5/22.pdfprocess organization designkey process eventcalendarsschedulesplanning hierarchyengineering companyschedulingорганизационно-технологическое проектированиеключевое технологическое событиекалендарно-сетевой графикиерархия планированияинжиниринговая компания |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Zharov Yaroslav Vladimirovich |
spellingShingle |
Zharov Yaroslav Vladimirovich Process organization design within the framework of construction projects ОРГАНИЗАЦИОННО-ТЕХНОЛОГИЧЕСКОЕ ПРОЕКТИРОВАНИЕПРИ РЕАЛИЗАЦИИ ИНВЕСТИЦИОННО-СТРОИТЕЛЬНЫХ ПРОЕКТОВ Vestnik MGSU process organization design key process event calendars schedules planning hierarchy engineering company scheduling организационно-технологическое проектирование ключевое технологическое событие календарно-сетевой график иерархия планирования инжиниринговая компания |
author_facet |
Zharov Yaroslav Vladimirovich |
author_sort |
Zharov Yaroslav Vladimirovich |
title |
Process organization design within the framework of construction projects ОРГАНИЗАЦИОННО-ТЕХНОЛОГИЧЕСКОЕ ПРОЕКТИРОВАНИЕПРИ РЕАЛИЗАЦИИ ИНВЕСТИЦИОННО-СТРОИТЕЛЬНЫХ ПРОЕКТОВ |
title_short |
Process organization design within the framework of construction projects ОРГАНИЗАЦИОННО-ТЕХНОЛОГИЧЕСКОЕ ПРОЕКТИРОВАНИЕПРИ РЕАЛИЗАЦИИ ИНВЕСТИЦИОННО-СТРОИТЕЛЬНЫХ ПРОЕКТОВ |
title_full |
Process organization design within the framework of construction projects ОРГАНИЗАЦИОННО-ТЕХНОЛОГИЧЕСКОЕ ПРОЕКТИРОВАНИЕПРИ РЕАЛИЗАЦИИ ИНВЕСТИЦИОННО-СТРОИТЕЛЬНЫХ ПРОЕКТОВ |
title_fullStr |
Process organization design within the framework of construction projects ОРГАНИЗАЦИОННО-ТЕХНОЛОГИЧЕСКОЕ ПРОЕКТИРОВАНИЕПРИ РЕАЛИЗАЦИИ ИНВЕСТИЦИОННО-СТРОИТЕЛЬНЫХ ПРОЕКТОВ |
title_full_unstemmed |
Process organization design within the framework of construction projects ОРГАНИЗАЦИОННО-ТЕХНОЛОГИЧЕСКОЕ ПРОЕКТИРОВАНИЕПРИ РЕАЛИЗАЦИИ ИНВЕСТИЦИОННО-СТРОИТЕЛЬНЫХ ПРОЕКТОВ |
title_sort |
process organization design within the framework of construction projects организационно-технологическое проектированиепри реализации инвестиционно-строительных проектов |
publisher |
Moscow State University of Civil Engineering (MGSU) |
series |
Vestnik MGSU |
issn |
1997-0935 2304-6600 |
publishDate |
2013-05-01 |
description |
The author describes the current practice of scheduling and organization of the work performance in the construction industry, which has assimilated the most advanced international standards. Any construction project contemplates a need to manage an extensive number of flows of information and material resources. Each of them is characterized by different values of intensity, versatile directions and scopes of work. Therefore, the author believes that a multi-level approach to scheduling of construction projects may intensify construction operations. It means that the whole range of scheduling actions shall apply to each level of the hierarchy of construction operations.In terms of long-term and medium-term planning, there is a need to formulate and approve a plan for attainment of key technology-related objectives throughout the entire period of construction works. Annual planning is necessary to outline the roadmap for implementation of annual delivery plans in accordance with the pre-set technological and economic parameters, to ensure timely commissioning of facilities under construction and efficient management of human and material resources. Quarterly schedules are to clarify the structure of an annual schedule, while monthly and weekly scheduling is primarily to clarify relevant sections of the annual plan in case of its alteration caused by changes in the project status.<br>Рассмотрена существующая практика планирования и организации в строительстве, являющаяся в настоящее время наиболее прогрессивной и соответствующая мировым стандартам в этой сфере. Необходимость управления большим количеством различных по интенсивности, направлению, объему, схемам прохождения информационных, материально-технических потоков, а также потоков регулирующих воздействий со стороны организатора строительства указывает на целесообразность использования многоуровнего подхода в планировании реализации инвестиционно-строительных проектов с целью повышения эффективности и интенсификации строительного производства. |
topic |
process organization design key process event calendars schedules planning hierarchy engineering company scheduling организационно-технологическое проектирование ключевое технологическое событие календарно-сетевой график иерархия планирования инжиниринговая компания |
url |
http://vestnikmgsu.ru/files/archive/RUS/issuepage/2013/5/22.pdf |
work_keys_str_mv |
AT zharovyaroslavvladimirovich processorganizationdesignwithintheframeworkofconstructionprojectsorganizacionnotehnologičeskoeproektirovanieprirealizaciiinvesticionnostroitelʹnyhproektov |
_version_ |
1725313054982275072 |