Process organization design within the framework of construction projects ОРГАНИЗАЦИОННО-ТЕХНОЛОГИЧЕСКОЕ ПРОЕКТИРОВАНИЕПРИ РЕАЛИЗАЦИИ ИНВЕСТИЦИОННО-СТРОИТЕЛЬНЫХ ПРОЕКТОВ

The author describes the current practice of scheduling and organization of the work performance in the construction industry, which has assimilated the most advanced international standards. Any construction project contemplates a need to manage an extensive number of flows of information and mater...

Full description

Bibliographic Details
Main Author: Zharov Yaroslav Vladimirovich
Format: Article
Language:English
Published: Moscow State University of Civil Engineering (MGSU) 2013-05-01
Series:Vestnik MGSU
Subjects:
Online Access:http://vestnikmgsu.ru/files/archive/RUS/issuepage/2013/5/22.pdf
Description
Summary:The author describes the current practice of scheduling and organization of the work performance in the construction industry, which has assimilated the most advanced international standards. Any construction project contemplates a need to manage an extensive number of flows of information and material resources. Each of them is characterized by different values of intensity, versatile directions and scopes of work. Therefore, the author believes that a multi-level approach to scheduling of construction projects may intensify construction operations. It means that the whole range of scheduling actions shall apply to each level of the hierarchy of construction operations.In terms of long-term and medium-term planning, there is a need to formulate and approve a plan for attainment of key technology-related objectives throughout the entire period of construction works. Annual planning is necessary to outline the roadmap for implementation of annual delivery plans in accordance with the pre-set technological and economic parameters, to ensure timely commissioning of facilities under construction and efficient management of human and material resources. Quarterly schedules are to clarify the structure of an annual schedule, while monthly and weekly scheduling is primarily to clarify relevant sections of the annual plan in case of its alteration caused by changes in the project status.<br>Рассмотрена существующая практика планирования и организации в строительстве, являющаяся в настоящее время наиболее прогрессивной и соответствующая мировым стандартам в этой сфере. Необходимость управления большим количеством различных по интенсивности, направлению, объему, схемам прохождения информационных, материально-технических потоков, а также потоков регулирующих воздействий со стороны организатора строительства указывает на целесообразность использования многоуровнего подхода в планировании реализации инвестиционно-строительных проектов с целью повышения эффективности и интенсификации строительного производства.
ISSN:1997-0935
2304-6600