Two-agent scheduling with generalized due dates
In this paper we consider the problems of order pickers in warehouse management. We interpret the problems as machine scheduling problems in which the due dates are not specified for the jobs but for their positions. In addition, we also consider the situation where there exist two types of orders:...
Main Authors: | Myoung-Ju Park, Yun-Hong Min, Byung-Cheon Choi |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2018-12-01
|
Series: | Asian Journal of Shipping and Logistics |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2092521218300816 |
Similar Items
-
Nature-Inspired Metaheuristics for Two-Agent Scheduling with Due Date and Release Time
by: Hongwei Li, et al.
Published: (2020-01-01) -
A Single-Machine Scheduling Problem with Uncertainty in Processing Times and Outsourcing Costs
by: Myoung-Ju Park, et al.
Published: (2017-01-01) -
Production Scheduling considering Outsourcing Options and Carrier Costs
by: Byung-Cheon Choi, et al.
Published: (2020-01-01) -
Two-Machine Flow-Shop Scheduling with Due Date Considerations
by: Zhao, Qi-Ming, et al.
Published: (1998) -
Scheduling Problems with Due Date Assignment
by: Yunqiang Yin, et al.
Published: (2015-01-01)