Improving the energy efficiency of wide crossings of overhead power lines

The use of new generation wires in the design of wide spans of overhead power lines over water barriers and large gorges can increase their transmission capacity and increase reliability. However, when large currents flow, load losses in line also increase. Thus, it is necessary to obtain a methodol...

Full description

Bibliographic Details
Main Authors: Shevchenko Natalya, Soshinov Anatoly, Elfimova Olga, Lebedeva Julia, Akhmedova Olga
Format: Article
Language:English
Published: EDP Sciences 2020-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/38/e3sconf_hsted2020_01046.pdf
id doaj-c9572558ec724363a356dc318656eb3d
record_format Article
spelling doaj-c9572558ec724363a356dc318656eb3d2021-04-02T14:10:41ZengEDP SciencesE3S Web of Conferences2267-12422020-01-011780104610.1051/e3sconf/202017801046e3sconf_hsted2020_01046Improving the energy efficiency of wide crossings of overhead power linesShevchenko Natalya0Soshinov Anatoly1Elfimova Olga2Lebedeva Julia3Akhmedova Olga4Kamyshin Technological Institute (branch) of Volgograd State Technical UniversityKamyshin Technological Institute (branch) of Volgograd State Technical UniversityKamyshin Technological Institute (branch) of Volgograd State Technical UniversityKamyshin Technological Institute (branch) of Volgograd State Technical UniversityKamyshin Technological Institute (branch) of Volgograd State Technical UniversityThe use of new generation wires in the design of wide spans of overhead power lines over water barriers and large gorges can increase their transmission capacity and increase reliability. However, when large currents flow, load losses in line also increase. Thus, it is necessary to obtain a methodology for technical and economic comparison of design options for overhead power lines over large crossings, which enables to determine the most cost-effective version of the project with high mechanical reliability. For comparative analysis, five options for wide spans of overhead power lines over the river with new-generation wires of Russian production were compiled: Aluminium Alloy Conductor Steel Reinforced, Z-type (high conductivity), Thermal-Resistant Conductor, Aluminium Compozite Core Conductor, ASk2y. Option with Aluminium Conductor Steel Reinforced wire was taken as the source. For the first option, the crossing scheme E-A-A-E was selected, for the remaining options E-I-I-E scheme was considered. For the modes of maximum loads, minimum temperature and average annual conditions, the mechanical calculation of wires was carried out using the method of permissible stresses. The wire bending deflections were determined in accordance with the theory of the catenary curve. The method of integrated indicators was used to perform a technical and economic comparison of these options. The calculation results showed that among the proposed options, the most optimal is a crossing with the ACCC wire having minimum relative investment per 1 MW of transmitted electricity and minimal power loss. The transmission capacity of the line with this wire is increased by 1.8 times, and the cost of crossing is reduced by 16%. Due to the compact design of wire, the probability of ice formation on wire is reduced, and the reduced bending deflection reduces the probability of wire break due to natural environmental influences.https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/38/e3sconf_hsted2020_01046.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Shevchenko Natalya
Soshinov Anatoly
Elfimova Olga
Lebedeva Julia
Akhmedova Olga
spellingShingle Shevchenko Natalya
Soshinov Anatoly
Elfimova Olga
Lebedeva Julia
Akhmedova Olga
Improving the energy efficiency of wide crossings of overhead power lines
E3S Web of Conferences
author_facet Shevchenko Natalya
Soshinov Anatoly
Elfimova Olga
Lebedeva Julia
Akhmedova Olga
author_sort Shevchenko Natalya
title Improving the energy efficiency of wide crossings of overhead power lines
title_short Improving the energy efficiency of wide crossings of overhead power lines
title_full Improving the energy efficiency of wide crossings of overhead power lines
title_fullStr Improving the energy efficiency of wide crossings of overhead power lines
title_full_unstemmed Improving the energy efficiency of wide crossings of overhead power lines
title_sort improving the energy efficiency of wide crossings of overhead power lines
publisher EDP Sciences
series E3S Web of Conferences
issn 2267-1242
publishDate 2020-01-01
description The use of new generation wires in the design of wide spans of overhead power lines over water barriers and large gorges can increase their transmission capacity and increase reliability. However, when large currents flow, load losses in line also increase. Thus, it is necessary to obtain a methodology for technical and economic comparison of design options for overhead power lines over large crossings, which enables to determine the most cost-effective version of the project with high mechanical reliability. For comparative analysis, five options for wide spans of overhead power lines over the river with new-generation wires of Russian production were compiled: Aluminium Alloy Conductor Steel Reinforced, Z-type (high conductivity), Thermal-Resistant Conductor, Aluminium Compozite Core Conductor, ASk2y. Option with Aluminium Conductor Steel Reinforced wire was taken as the source. For the first option, the crossing scheme E-A-A-E was selected, for the remaining options E-I-I-E scheme was considered. For the modes of maximum loads, minimum temperature and average annual conditions, the mechanical calculation of wires was carried out using the method of permissible stresses. The wire bending deflections were determined in accordance with the theory of the catenary curve. The method of integrated indicators was used to perform a technical and economic comparison of these options. The calculation results showed that among the proposed options, the most optimal is a crossing with the ACCC wire having minimum relative investment per 1 MW of transmitted electricity and minimal power loss. The transmission capacity of the line with this wire is increased by 1.8 times, and the cost of crossing is reduced by 16%. Due to the compact design of wire, the probability of ice formation on wire is reduced, and the reduced bending deflection reduces the probability of wire break due to natural environmental influences.
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/38/e3sconf_hsted2020_01046.pdf
work_keys_str_mv AT shevchenkonatalya improvingtheenergyefficiencyofwidecrossingsofoverheadpowerlines
AT soshinovanatoly improvingtheenergyefficiencyofwidecrossingsofoverheadpowerlines
AT elfimovaolga improvingtheenergyefficiencyofwidecrossingsofoverheadpowerlines
AT lebedevajulia improvingtheenergyefficiencyofwidecrossingsofoverheadpowerlines
AT akhmedovaolga improvingtheenergyefficiencyofwidecrossingsofoverheadpowerlines
_version_ 1721562991804022784