Analysis of load carrying capacity and destruction mechanism of an intermediate anchorage steel plate for pillar jib crane
Pillar jib cranes are often mounted to existing floors with the use of an intermediate anchorage steel plate instead of using independent foundations. The process of designing such an intermediate plate for a pillar jib crane and a destruction pattern for plates of insufficient thickness are present...
Main Authors: | Gordziej-Zagórowska Małgorzata, Migda Wojciech |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201821902016 |
Similar Items
-
Slewing Port Jib Cranes
by: Boris Visočnik, et al.
Published: (2002-09-01) -
Stress Analysis of Crane Jib
by: Chen, Kun-Yuh, et al.
Published: (1995) -
Load carrying capacity of the eccentric joint in the truss made of open cross-sections
by: Gordziej-Zagórowska Małgorzata, et al.
Published: (2018-01-01) -
Modeling of dynamic loadings on a tower crane jib
by: Kudryavtsev Evgenij, et al.
Published: (2020-01-01) -
The effect of wind forces on the design and operation of Jib Cranes
by: Eden, J. F.
Published: (1978)