Effect of Force Major on Destiny &Base of Non-responsibility in Breach of Contractual Omission Obligations (Comparative Study Between Afghanistan &Iran Civil Law)
legislators in both countries Afghanistan and Iran have provided that, happening unavoidable external event is a cause for non-responsibility that Force major is one type of the event. Now considering effect of the event on obligator’s responsibility and also natural difference between omission and...
Main Author: | alireza ibrahimy |
---|---|
Format: | Article |
Language: | fas |
Published: |
Allameh Tabataba'i University Press
2020-01-01
|
Series: | Faṣlnāmah-i Pizhūhish-i Huqūq-i Khuṣūṣī |
Subjects: | |
Online Access: | http://jplr.atu.ac.ir/article_10853_a692d5883fc90622ccdc022cecdfb45a.pdf |
Similar Items
-
Theories of cause (consideration) of contract in the Serbian doctrine of civil law after the adoption of the Law on Obligations
by: Dudaš Atila
Published: (2012-01-01) -
Theoretical points of view on the notion of cause (consideration) of contracts in the Serbian doctrine of civil law till the adoption of the law on obligations
by: Dudaš Atila
Published: (2011-01-01) -
Execution of non-contractual regulative obligations
by: В. М. Ігнатенко
Published: (2016-03-01) -
Analysis of the Nature of the Fulfillment of the Obligation in Iran and in France Civil Codes
by: Zahra Babajani, et al.
Published: (2019-03-01) -
Cause of contract: French influence on the Law on Obligations of the Republic of Serbia
by: Dudaš Atila
Published: (2011-01-01)