Comparison between dynamic programming and genetic algorithm for hydro unit economic load dispatch
The hydro unit economic load dispatch (ELD) is of great importance in energy conservation and emission reduction. Dynamic programming (DP) and genetic algorithm (GA) are two representative algorithms for solving ELD problems. The goal of this study was to examine the performance of DP and GA while t...
Main Authors: | Bin Xu, Ping-an Zhong, Yun-fa Zhao, Yu-zuo Zhu, Gao-qi Zhang |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2014-10-01
|
Series: | Water Science and Engineering |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1674237015302994 |
Similar Items
-
Unit commitment optimisation of hydro-thermal power systems in the day-ahead electricity market
by: S.A. Bello, et al.
Published: (2016-12-01) -
Economic Load Dispatch Unit Pembangkit Termal Mempertimbangkan Penambahan Pembangkit Tenaga Angin Dengan Menggunakan Firefly Algorithm
by: Ridho Syahrial Ibrahim, et al.
Published: (2017-03-01) -
SOLVING ECONOMIC LOAD DISPATCH WITH RELIABILITY INDICATORS
by: Falah A. Athab, et al.
Published: (2020-11-01) -
New Algorithms for Some Economic Dispatch Problems
by: Navin, S
Published: (2018) -
Verification of turbine and governor model of hydro generator unit for the purpose of load frequency control system simulation
by: Džepčeski Dane, et al.
Published: (2015-01-01)