Efficiency justification for stone-concrete face zone of rockfill dams with reinforced concrete face
At present, over 600 dams with a reinforced concrete face are built worldwide; 7 of them are higher than 200 m. However, most of these dams have an inherent disadvantage – face cracking [1, 2, 3], caused by face deformations resulted from the difference in deformation properties of the face and down...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/40/e3sconf_conmechydro2021_03022.pdf |
id |
doaj-c7abcab7fd624f2aafcdf91c2ea1f352 |
---|---|
record_format |
Article |
spelling |
doaj-c7abcab7fd624f2aafcdf91c2ea1f3522021-06-11T07:16:51ZengEDP SciencesE3S Web of Conferences2267-12422021-01-012640302210.1051/e3sconf/202126403022e3sconf_conmechydro2021_03022Efficiency justification for stone-concrete face zone of rockfill dams with reinforced concrete faceBestuzheva Aleksandra0Gadai Dimitri1Moscow State University of Civil EngineeringJSC "Institute "Orgenergostroy"At present, over 600 dams with a reinforced concrete face are built worldwide; 7 of them are higher than 200 m. However, most of these dams have an inherent disadvantage – face cracking [1, 2, 3], caused by face deformations resulted from the difference in deformation properties of the face and downstream toe. To solve this problem, the authors consider the arrangement of a massive stone-concrete face zone.https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/40/e3sconf_conmechydro2021_03022.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Bestuzheva Aleksandra Gadai Dimitri |
spellingShingle |
Bestuzheva Aleksandra Gadai Dimitri Efficiency justification for stone-concrete face zone of rockfill dams with reinforced concrete face E3S Web of Conferences |
author_facet |
Bestuzheva Aleksandra Gadai Dimitri |
author_sort |
Bestuzheva Aleksandra |
title |
Efficiency justification for stone-concrete face zone of rockfill dams with reinforced concrete face |
title_short |
Efficiency justification for stone-concrete face zone of rockfill dams with reinforced concrete face |
title_full |
Efficiency justification for stone-concrete face zone of rockfill dams with reinforced concrete face |
title_fullStr |
Efficiency justification for stone-concrete face zone of rockfill dams with reinforced concrete face |
title_full_unstemmed |
Efficiency justification for stone-concrete face zone of rockfill dams with reinforced concrete face |
title_sort |
efficiency justification for stone-concrete face zone of rockfill dams with reinforced concrete face |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2021-01-01 |
description |
At present, over 600 dams with a reinforced concrete face are built worldwide; 7 of them are higher than 200 m. However, most of these dams have an inherent disadvantage – face cracking [1, 2, 3], caused by face deformations resulted from the difference in deformation properties of the face and downstream toe. To solve this problem, the authors consider the arrangement of a massive stone-concrete face zone. |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/40/e3sconf_conmechydro2021_03022.pdf |
work_keys_str_mv |
AT bestuzhevaaleksandra efficiencyjustificationforstoneconcretefacezoneofrockfilldamswithreinforcedconcreteface AT gadaidimitri efficiencyjustificationforstoneconcretefacezoneofrockfilldamswithreinforcedconcreteface |
_version_ |
1721383047036665856 |