At present, over 600 dams with a reinforced concrete face are built worldwide; 7 of them are higher than 200 m. However, most of these dams have an inherent disadvantage – face cracking [1, 2, 3], caused by face deformations resulted from the difference in deformation properties of the face and down...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/40/e3sconf_conmechydro2021_03022.pdf |
Summary: | At present, over 600 dams with a reinforced concrete face are built worldwide; 7 of them are higher than 200 m. However, most of these dams have an inherent disadvantage – face cracking [1, 2, 3], caused by face deformations resulted from the difference in deformation properties of the face and downstream toe. To solve this problem, the authors consider the arrangement of a massive stone-concrete face zone. |
---|---|
ISSN: | 2267-1242 |