Success factors in the implementation of statistical process control: action research in a chemical plant
Abstract Despite the Statistical Process Control (SPC) be extensively explored in the literature, there are still difficulties in the implementation and maintenance, usually due to lack of attention to Critical Success Factors (CSF). This paper identified by literature review, critical factors that...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Associação Brasileira de Engenharia de Produção (ABEPRO)
|
Series: | Production |
Subjects: | |
Online Access: | http://www.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132017000100312&lng=en&tlng=en |
id |
doaj-c6786e1aa564421a80a8f548514eb0cc |
---|---|
record_format |
Article |
spelling |
doaj-c6786e1aa564421a80a8f548514eb0cc2020-11-24T21:49:59ZengAssociação Brasileira de Engenharia de Produção (ABEPRO)Production1980-541127010.1590/0103-6513.220816S0103-65132017000100312Success factors in the implementation of statistical process control: action research in a chemical plantJose Carlos de ToledoFabiane Letícia LizarelliManoel Bispo Santana JuniorAbstract Despite the Statistical Process Control (SPC) be extensively explored in the literature, there are still difficulties in the implementation and maintenance, usually due to lack of attention to Critical Success Factors (CSF). This paper identified by literature review, critical factors that contribute to the success of the SPC and through an action research was implemented a control chart in a chemical plant using these factors. The attention to CSF during planning, implementation and the discussion with the process team resulted in the implementation and acceptance of control charts by the operational teams of the company, with continuing indications of use. The results enabled a framework to apply control charts based on CSF.http://www.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132017000100312&lng=en&tlng=enControl chartsCritical success factorsImplementationStatistical process control |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Jose Carlos de Toledo Fabiane Letícia Lizarelli Manoel Bispo Santana Junior |
spellingShingle |
Jose Carlos de Toledo Fabiane Letícia Lizarelli Manoel Bispo Santana Junior Success factors in the implementation of statistical process control: action research in a chemical plant Production Control charts Critical success factors Implementation Statistical process control |
author_facet |
Jose Carlos de Toledo Fabiane Letícia Lizarelli Manoel Bispo Santana Junior |
author_sort |
Jose Carlos de Toledo |
title |
Success factors in the implementation of statistical process control: action research in a chemical plant |
title_short |
Success factors in the implementation of statistical process control: action research in a chemical plant |
title_full |
Success factors in the implementation of statistical process control: action research in a chemical plant |
title_fullStr |
Success factors in the implementation of statistical process control: action research in a chemical plant |
title_full_unstemmed |
Success factors in the implementation of statistical process control: action research in a chemical plant |
title_sort |
success factors in the implementation of statistical process control: action research in a chemical plant |
publisher |
Associação Brasileira de Engenharia de Produção (ABEPRO) |
series |
Production |
issn |
1980-5411 |
description |
Abstract Despite the Statistical Process Control (SPC) be extensively explored in the literature, there are still difficulties in the implementation and maintenance, usually due to lack of attention to Critical Success Factors (CSF). This paper identified by literature review, critical factors that contribute to the success of the SPC and through an action research was implemented a control chart in a chemical plant using these factors. The attention to CSF during planning, implementation and the discussion with the process team resulted in the implementation and acceptance of control charts by the operational teams of the company, with continuing indications of use. The results enabled a framework to apply control charts based on CSF. |
topic |
Control charts Critical success factors Implementation Statistical process control |
url |
http://www.scielo.br/scielo.php?script=sci_arttext&pid=S0103-65132017000100312&lng=en&tlng=en |
work_keys_str_mv |
AT josecarlosdetoledo successfactorsintheimplementationofstatisticalprocesscontrolactionresearchinachemicalplant AT fabianeleticializarelli successfactorsintheimplementationofstatisticalprocesscontrolactionresearchinachemicalplant AT manoelbisposantanajunior successfactorsintheimplementationofstatisticalprocesscontrolactionresearchinachemicalplant |
_version_ |
1725885944249188352 |