A Grey-BPNN Model for Evaluating the Competitiveness of Chinese Contractors in the High-Speed Rail Market in Europe
With the planning and progress of the construction of the trans-Eurasian high-speed rail (HSR) network, it becomes an important issue for Chinese contractors to enter the European HSR market. Facing the world’s most competitive contractors and their high technology levels, Chinese contractors will n...
Main Authors: | Yi-Hsin Lin, Biling Shi, Po-Han Chen, Zhao Xu, Huimin Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2019-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2019/5858094 |
Similar Items
-
The Moderating Effect of Guanxi on the Dynamic Capacity and Competitive Advantage of Chinese International Contractors
by: Yi-Hsin Lin, et al.
Published: (2018-01-01) -
Impact of rail infrastructure charging systems implemented in europe on the competitiveness of high speed services
by: Sánchez Borràs, Marta
Published: (2009) -
Multi-objective Optimization of InjectionMolding Parameters Using Taguchi-based Grey Relational Analysis, BPNN, and Hybird PSO-GA
by: Chang,Po-Yao, et al.
Published: (2014) -
The impact of the international construction standard application capability on contractors’ competitiveness: Chinese contractors’ experience
by: Dingyuan Ma, et al.
Published: (2020-11-01) -
The drivers of Brazilian contractors' competitiveness in the international market
by: Mutti, Cristine do Nascimento
Published: (2005)