Analyzing the potential and the load evaluation on Ubrug hydro power plant of Sukabumi, West Java

Built in 1923, the Ubrug Hydro Power Plant in Sukabumi was set up with an installed power of 5,94 MW on 1st unit and 2nd unit and 6,48 MW on the 3rd unit resulting in sum total of 18,36 MW. However, at present, the actual total power only generates 15,045 MW, a smaller number than its initial capaci...