Analyzing the potential and the load evaluation on Ubrug hydro power plant of Sukabumi, West Java
Built in 1923, the Ubrug Hydro Power Plant in Sukabumi was set up with an installed power of 5,94 MW on 1st unit and 2nd unit and 6,48 MW on the 3rd unit resulting in sum total of 18,36 MW. However, at present, the actual total power only generates 15,045 MW, a smaller number than its initial capaci...
Main Authors: | Notosudjono Didik, Wismiana Evita, Alamsyah Fitrah, Ramadhon Bagus Dwi |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201815401043 |
Similar Items
-
Fungsi Teater Rakyat Ubrug Bagi Masyarakat Banten
by: Nur Seha, et al.
Published: (2014-06-01) -
Land-use in Sukabumi, West Java; Persistence and change
by: W. Donald MacTaggart
Published: (1982-04-01) -
Fauna diversity in Biodiversity Park of Mekarsari, Sukabumi, West Java
by: HENDRA GUNAWAN
Published: (2017-03-01) -
IDENTIFICATION OF STAKEHOLDER IN THE MANAGEMENT OF GEOPARK CILETUH IN SUKABUMI, WEST JAVA INDONESIA
by: Santoso Tri Raharjo, et al.
Published: (2020-08-01) -
Imported malaria cases in Sukabumi District-West Java Indonesia, in 2012
by: Eryando Tris, et al.
Published: (2012-10-01)