Analyzing the potential and the load evaluation on Ubrug hydro power plant of Sukabumi, West Java
Built in 1923, the Ubrug Hydro Power Plant in Sukabumi was set up with an installed power of 5,94 MW on 1st unit and 2nd unit and 6,48 MW on the 3rd unit resulting in sum total of 18,36 MW. However, at present, the actual total power only generates 15,045 MW, a smaller number than its initial capaci...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201815401043 |
id |
doaj-c5a71da97b634522963d137d22f67759 |
---|---|
record_format |
Article |
spelling |
doaj-c5a71da97b634522963d137d22f677592021-02-02T06:29:47ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-011540104310.1051/matecconf/201815401043matecconf_icet4sd2018_01043Analyzing the potential and the load evaluation on Ubrug hydro power plant of Sukabumi, West JavaNotosudjono DidikWismiana EvitaAlamsyah FitrahRamadhon Bagus DwiBuilt in 1923, the Ubrug Hydro Power Plant in Sukabumi was set up with an installed power of 5,94 MW on 1st unit and 2nd unit and 6,48 MW on the 3rd unit resulting in sum total of 18,36 MW. However, at present, the actual total power only generates 15,045 MW, a smaller number than its initial capacity, due to the lack of water discharge. Based on the measurement data, the load of the generator has experienced a decrease of power in normal field operation with a peak load of 9,5 MW and the lowest of 6 MW. On daily operations, only 2 generators are being operated, leaving the 3rd generator unoperated. This is due to the aging hydroelectric power plant on the location and the transition of forest functions in the upstream area, that serves as water absorption, to settlements of residents, and industrial estates. The other and the most salient cause is the waste carried by the Cicatih River coming along with the flow of water in the conduit.https://doi.org/10.1051/matecconf/201815401043 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Notosudjono Didik Wismiana Evita Alamsyah Fitrah Ramadhon Bagus Dwi |
spellingShingle |
Notosudjono Didik Wismiana Evita Alamsyah Fitrah Ramadhon Bagus Dwi Analyzing the potential and the load evaluation on Ubrug hydro power plant of Sukabumi, West Java MATEC Web of Conferences |
author_facet |
Notosudjono Didik Wismiana Evita Alamsyah Fitrah Ramadhon Bagus Dwi |
author_sort |
Notosudjono Didik |
title |
Analyzing the potential and the load evaluation on Ubrug hydro power plant of Sukabumi, West Java |
title_short |
Analyzing the potential and the load evaluation on Ubrug hydro power plant of Sukabumi, West Java |
title_full |
Analyzing the potential and the load evaluation on Ubrug hydro power plant of Sukabumi, West Java |
title_fullStr |
Analyzing the potential and the load evaluation on Ubrug hydro power plant of Sukabumi, West Java |
title_full_unstemmed |
Analyzing the potential and the load evaluation on Ubrug hydro power plant of Sukabumi, West Java |
title_sort |
analyzing the potential and the load evaluation on ubrug hydro power plant of sukabumi, west java |
publisher |
EDP Sciences |
series |
MATEC Web of Conferences |
issn |
2261-236X |
publishDate |
2018-01-01 |
description |
Built in 1923, the Ubrug Hydro Power Plant in Sukabumi was set up with an installed power of 5,94 MW on 1st unit and 2nd unit and 6,48 MW on the 3rd unit resulting in sum total of 18,36 MW. However, at present, the actual total power only generates 15,045 MW, a smaller number than its initial capacity, due to the lack of water discharge. Based on the measurement data, the load of the generator has experienced a decrease of power in normal field operation with a peak load of 9,5 MW and the lowest of 6 MW. On daily operations, only 2 generators are being operated, leaving the 3rd generator unoperated. This is due to the aging hydroelectric power plant on the location and the transition of forest functions in the upstream area, that serves as water absorption, to settlements of residents, and industrial estates. The other and the most salient cause is the waste carried by the Cicatih River coming along with the flow of water in the conduit. |
url |
https://doi.org/10.1051/matecconf/201815401043 |
work_keys_str_mv |
AT notosudjonodidik analyzingthepotentialandtheloadevaluationonubrughydropowerplantofsukabumiwestjava AT wismianaevita analyzingthepotentialandtheloadevaluationonubrughydropowerplantofsukabumiwestjava AT alamsyahfitrah analyzingthepotentialandtheloadevaluationonubrughydropowerplantofsukabumiwestjava AT ramadhonbagusdwi analyzingthepotentialandtheloadevaluationonubrughydropowerplantofsukabumiwestjava |
_version_ |
1724301230272937984 |