Implementation of Building Information Modeling (BIM) Using Hybrid Z-DEMATEL-ISM Approach

Due to the shortcomings of the traditional construction project management system, there is a feeling among those involved in this industry that new tools and approaches should be used to facilitate simple and complex operations. On the contrary, there is no integrated database for all construction...

Full description

Bibliographic Details
Main Authors: Ali RezaHoseini, Elmira Ahmadi, Pantea Saremi, Morteza BagherPour
Format: Article
Language:English
Published: Hindawi Limited 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/6686761
id doaj-c5a128f3b5054b27b747a8d2b212f741
record_format Article
spelling doaj-c5a128f3b5054b27b747a8d2b212f7412021-03-01T01:14:44ZengHindawi LimitedAdvances in Civil Engineering1687-80942021-01-01202110.1155/2021/6686761Implementation of Building Information Modeling (BIM) Using Hybrid Z-DEMATEL-ISM ApproachAli RezaHoseini0Elmira Ahmadi1Pantea Saremi2Morteza BagherPour3School of Industrial EngineeringSchool of Industrial EngineeringSchool of Industrial EngineeringSchool of Industrial EngineeringDue to the shortcomings of the traditional construction project management system, there is a feeling among those involved in this industry that new tools and approaches should be used to facilitate simple and complex operations. On the contrary, there is no integrated database for all construction sectors, and of course the relationship between these sectors is a major problem for any construction project. The technology and tool that overcomes many of these shortcomings is BIM technology. This paper seeks to identify all the challenges that hinder the successful implementation of BIM and determine important challenges based on Z-DEMATEL-ISM Hybrid approaches. The DEMATEL method is used to obtain the weight of the challenges and the most influencing and influenced challenges. The ISM approach is then employed to design a hierarchical network of challenges and tries to determine the level and impact of each challenge in the planned structure. For closeness to the real-world, Z-number (an ordered pair of fuzzy numbers, where the first component controls on a fuzzy variable, and the second component is a measure of reliability for the fuzzy component) is also used to consider the expert’s mental uncertainties in the final results. This research tries to examine the literature related to the subject and consider the sources and opinions of many professors and university experts based on the filled questionnaires. The findings of this paper show that “misunderstanding the BIM technology” is recognized as the most important challenge with the most weight. At the same time, “lack of governmental support” is the most influencing challenge, and “lack of interaction and teamwork” is the influenced challenge.http://dx.doi.org/10.1155/2021/6686761
collection DOAJ
language English
format Article
sources DOAJ
author Ali RezaHoseini
Elmira Ahmadi
Pantea Saremi
Morteza BagherPour
spellingShingle Ali RezaHoseini
Elmira Ahmadi
Pantea Saremi
Morteza BagherPour
Implementation of Building Information Modeling (BIM) Using Hybrid Z-DEMATEL-ISM Approach
Advances in Civil Engineering
author_facet Ali RezaHoseini
Elmira Ahmadi
Pantea Saremi
Morteza BagherPour
author_sort Ali RezaHoseini
title Implementation of Building Information Modeling (BIM) Using Hybrid Z-DEMATEL-ISM Approach
title_short Implementation of Building Information Modeling (BIM) Using Hybrid Z-DEMATEL-ISM Approach
title_full Implementation of Building Information Modeling (BIM) Using Hybrid Z-DEMATEL-ISM Approach
title_fullStr Implementation of Building Information Modeling (BIM) Using Hybrid Z-DEMATEL-ISM Approach
title_full_unstemmed Implementation of Building Information Modeling (BIM) Using Hybrid Z-DEMATEL-ISM Approach
title_sort implementation of building information modeling (bim) using hybrid z-dematel-ism approach
publisher Hindawi Limited
series Advances in Civil Engineering
issn 1687-8094
publishDate 2021-01-01
description Due to the shortcomings of the traditional construction project management system, there is a feeling among those involved in this industry that new tools and approaches should be used to facilitate simple and complex operations. On the contrary, there is no integrated database for all construction sectors, and of course the relationship between these sectors is a major problem for any construction project. The technology and tool that overcomes many of these shortcomings is BIM technology. This paper seeks to identify all the challenges that hinder the successful implementation of BIM and determine important challenges based on Z-DEMATEL-ISM Hybrid approaches. The DEMATEL method is used to obtain the weight of the challenges and the most influencing and influenced challenges. The ISM approach is then employed to design a hierarchical network of challenges and tries to determine the level and impact of each challenge in the planned structure. For closeness to the real-world, Z-number (an ordered pair of fuzzy numbers, where the first component controls on a fuzzy variable, and the second component is a measure of reliability for the fuzzy component) is also used to consider the expert’s mental uncertainties in the final results. This research tries to examine the literature related to the subject and consider the sources and opinions of many professors and university experts based on the filled questionnaires. The findings of this paper show that “misunderstanding the BIM technology” is recognized as the most important challenge with the most weight. At the same time, “lack of governmental support” is the most influencing challenge, and “lack of interaction and teamwork” is the influenced challenge.
url http://dx.doi.org/10.1155/2021/6686761
work_keys_str_mv AT alirezahoseini implementationofbuildinginformationmodelingbimusinghybridzdematelismapproach
AT elmiraahmadi implementationofbuildinginformationmodelingbimusinghybridzdematelismapproach
AT panteasaremi implementationofbuildinginformationmodelingbimusinghybridzdematelismapproach
AT mortezabagherpour implementationofbuildinginformationmodelingbimusinghybridzdematelismapproach
_version_ 1714842384365256704