Optimal placement of Phasor Measurement Unit considering System Observability Redundancy Index: case study of the Kenya power transmission network
Modern power systems require advanced monitoring and control, a capability made possible by Phasor Measurement Units (PMUs) aided by synchrophasor technology. Because PMUs have significant costs, it is necessary to optimally place them in an electrical power network. This paper proposes the Optimal...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2021-07-01
|
Series: | Heliyon |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2405844021017734 |