MEASURING THE MATURITY OF GUYANA’S CONSTRUCTION INDUSTRY USING THE CONSTRUCTION INDUSTRY MACRO MATURITY MODEL (CIM3)
The newly developed Construction Industry Macro Maturity Model (CIM3) was used to measure the maturity of Guyana’s construction industry. The CIM3’s assessment provides a leading indication of performance by relating the maturity of a set of management and operation key practices in the construction...
Main Authors: | Christopher J. Willis, Jeff H. Rankin |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit Universiti Sains Malaysia
2010-12-01
|
Series: | Journal of Construction in Developing Countries |
Subjects: | |
Online Access: | http://web.usm.my/jcdc/input/JCDC%20Vol%2015(2)/JCDC%2015(2)%202010-ART%205_corrected_(87-116)_21.12.2010eit.pdf |
Similar Items
-
Measuring The Maturity Of Guyana's Construction Industry Using The Construction Industry Macro Maturity Model (CIM3)
by: Willis, Christopher J., et al.
Published: (2010) -
MEASURING THE PERFORMANCE OF GUYANA’S CONSTRUCTION INDUSTRY USING A SET OF PROJECT PERFORMANCE BENCHMARKING METRICS
by: Christopher J. Willis, et al.
Published: (2011-10-01) -
Hibrit Çim Uygulama Yönteminin Futbol Sahası Örneğinde İncelenmesi
by: Mehmet Kıvanç Ak, et al.
Published: (2018-08-01) -
Combination of modified carbapenem inactivation method (mCIM) and EDTA-CIM (eCIM) for phenotypic detection of carbapenemase-producing Enterobacteriaceae
by: Ya-Min Tsai, et al.
Published: (2020-10-01) -
Potential evapotranspiration in different climatic regions of Guyana
by: Persaud, Chander.
Published: (1974)