A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare Parts
One of the most important activities in preventive maintenance is replacement of spare parts prior to failure. The aim of this paper is to propose an approach which determines jointly the preventive replacement interval and the spare parts inventory by considering different criteria and interacting...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Kharazmi University
2019-05-01
|
Series: | International Journal of Supply and Operations Management |
Subjects: | |
Online Access: | http://www.ijsom.com/article_2782_1ce09cad2ab5c14aa13d454d106924e0.pdf |
id |
doaj-c34776725358497baee8edf74beafd0e |
---|---|
record_format |
Article |
spelling |
doaj-c34776725358497baee8edf74beafd0e2021-09-29T04:17:23ZengKharazmi UniversityInternational Journal of Supply and Operations Management2383-13592383-25252019-05-016211012510.22034/2019.2.22782A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare PartsSeyed Mehran Hoseini0Naser Mollaverdi1S. Reza Hejazi2Mohammad Taghi Rezvan3Department of Industrial Engineering, Isfahan University of Technology, Isfahan, IranDepartment of Industrial Engineering, Isfahan University of Technology, Isfahan, IranDepartment of Industrial Engineering, Isfahan University of Technology, Isfahan, IranDepartment of Industrial Engineering, Faculty of Engineering, University of Kashan, Kashan, IranOne of the most important activities in preventive maintenance is replacement of spare parts prior to failure. The aim of this paper is to propose an approach which determines jointly the preventive replacement interval and the spare parts inventory by considering different criteria and interacting with decision makers. In this approach, preventive replacement intervals, determined by experts of production and maintenance, are ranked by analytical hierarchy process (AHP). Criteria such as cost per unit of time, availability, remaining lifetime, and reliability are used. Then, a mixed integer nonlinear multi-objective model presented that it simultaneously specifies the period of preventive replacement and the required number of spare parts. This model considers the mentioned criteria and the inventory control costs of spare parts as different objective functions. Since, the solution of the problem depends on the decision maker’s strategy, it need interact with the decision-makers and consequently the proposed model could be solved using goal programming approach. The applicability of the proposed approach is illustrated by two numerical examples. The effect of key parameters on the optimal decisions is investigated for two examples.http://www.ijsom.com/article_2782_1ce09cad2ab5c14aa13d454d106924e0.pdfpreventive replacementspare partsanalytical hierarchy process (ahp)goal programming |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Seyed Mehran Hoseini Naser Mollaverdi S. Reza Hejazi Mohammad Taghi Rezvan |
spellingShingle |
Seyed Mehran Hoseini Naser Mollaverdi S. Reza Hejazi Mohammad Taghi Rezvan A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare Parts International Journal of Supply and Operations Management preventive replacement spare parts analytical hierarchy process (ahp) goal programming |
author_facet |
Seyed Mehran Hoseini Naser Mollaverdi S. Reza Hejazi Mohammad Taghi Rezvan |
author_sort |
Seyed Mehran Hoseini |
title |
A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare Parts |
title_short |
A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare Parts |
title_full |
A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare Parts |
title_fullStr |
A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare Parts |
title_full_unstemmed |
A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare Parts |
title_sort |
multi-attribute approach for simultaneous determination of preventive replacement times and order quantity of spare parts |
publisher |
Kharazmi University |
series |
International Journal of Supply and Operations Management |
issn |
2383-1359 2383-2525 |
publishDate |
2019-05-01 |
description |
One of the most important activities in preventive maintenance is replacement of spare parts prior to failure. The aim of this paper is to propose an approach which determines jointly the preventive replacement interval and the spare parts inventory by considering different criteria and interacting with decision makers. In this approach, preventive replacement intervals, determined by experts of production and maintenance, are ranked by analytical hierarchy process (AHP). Criteria such as cost per unit of time, availability, remaining lifetime, and reliability are used. Then, a mixed integer nonlinear multi-objective model presented that it simultaneously specifies the period of preventive replacement and the required number of spare parts. This model considers the mentioned criteria and the inventory control costs of spare parts as different objective functions. Since, the solution of the problem depends on the decision maker’s strategy, it need interact with the decision-makers and consequently the proposed model could be solved using goal programming approach. The applicability of the proposed approach is illustrated by two numerical examples. The effect of key parameters on the optimal decisions is investigated for two examples. |
topic |
preventive replacement spare parts analytical hierarchy process (ahp) goal programming |
url |
http://www.ijsom.com/article_2782_1ce09cad2ab5c14aa13d454d106924e0.pdf |
work_keys_str_mv |
AT seyedmehranhoseini amultiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts AT nasermollaverdi amultiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts AT srezahejazi amultiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts AT mohammadtaghirezvan amultiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts AT seyedmehranhoseini multiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts AT nasermollaverdi multiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts AT srezahejazi multiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts AT mohammadtaghirezvan multiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts |
_version_ |
1716864969079783424 |