A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare Parts

One of the most important activities in preventive maintenance is replacement of spare parts prior to failure. The aim of this paper is to propose an approach which determines jointly the preventive replacement interval and the spare parts inventory by considering different criteria and interacting...

Full description

Bibliographic Details
Main Authors: Seyed Mehran Hoseini, Naser Mollaverdi, S. Reza Hejazi, Mohammad Taghi Rezvan
Format: Article
Language:English
Published: Kharazmi University 2019-05-01
Series:International Journal of Supply and Operations Management
Subjects:
Online Access:http://www.ijsom.com/article_2782_1ce09cad2ab5c14aa13d454d106924e0.pdf
id doaj-c34776725358497baee8edf74beafd0e
record_format Article
spelling doaj-c34776725358497baee8edf74beafd0e2021-09-29T04:17:23ZengKharazmi UniversityInternational Journal of Supply and Operations Management2383-13592383-25252019-05-016211012510.22034/2019.2.22782A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare PartsSeyed Mehran Hoseini0Naser Mollaverdi1S. Reza Hejazi2Mohammad Taghi Rezvan3Department of Industrial Engineering, Isfahan University of Technology, Isfahan, IranDepartment of Industrial Engineering, Isfahan University of Technology, Isfahan, IranDepartment of Industrial Engineering, Isfahan University of Technology, Isfahan, IranDepartment of Industrial Engineering, Faculty of Engineering, University of Kashan, Kashan, IranOne of the most important activities in preventive maintenance is replacement of spare parts prior to failure. The aim of this paper is to propose an approach which determines jointly the preventive replacement interval and the spare parts inventory by considering different criteria and interacting with decision makers. In this approach, preventive replacement intervals, determined by experts of production and maintenance, are ranked by analytical hierarchy process (AHP). Criteria such as cost per unit of time, availability, remaining lifetime, and reliability are used. Then, a mixed integer nonlinear multi-objective model presented that it simultaneously specifies the period of preventive replacement and the required number of spare parts. This model considers the mentioned criteria and the inventory control costs of spare parts as different objective functions. Since, the solution of the problem depends on the decision maker’s strategy, it need interact with the decision-makers and consequently the proposed model could be solved using goal programming approach. The applicability of the proposed approach is illustrated by two numerical examples. The effect of key parameters on the optimal decisions is investigated for two examples.http://www.ijsom.com/article_2782_1ce09cad2ab5c14aa13d454d106924e0.pdfpreventive replacementspare partsanalytical hierarchy process (ahp)goal programming
collection DOAJ
language English
format Article
sources DOAJ
author Seyed Mehran Hoseini
Naser Mollaverdi
S. Reza Hejazi
Mohammad Taghi Rezvan
spellingShingle Seyed Mehran Hoseini
Naser Mollaverdi
S. Reza Hejazi
Mohammad Taghi Rezvan
A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare Parts
International Journal of Supply and Operations Management
preventive replacement
spare parts
analytical hierarchy process (ahp)
goal programming
author_facet Seyed Mehran Hoseini
Naser Mollaverdi
S. Reza Hejazi
Mohammad Taghi Rezvan
author_sort Seyed Mehran Hoseini
title A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare Parts
title_short A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare Parts
title_full A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare Parts
title_fullStr A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare Parts
title_full_unstemmed A Multi-attribute Approach for Simultaneous Determination of Preventive Replacement Times and Order Quantity of Spare Parts
title_sort multi-attribute approach for simultaneous determination of preventive replacement times and order quantity of spare parts
publisher Kharazmi University
series International Journal of Supply and Operations Management
issn 2383-1359
2383-2525
publishDate 2019-05-01
description One of the most important activities in preventive maintenance is replacement of spare parts prior to failure. The aim of this paper is to propose an approach which determines jointly the preventive replacement interval and the spare parts inventory by considering different criteria and interacting with decision makers. In this approach, preventive replacement intervals, determined by experts of production and maintenance, are ranked by analytical hierarchy process (AHP). Criteria such as cost per unit of time, availability, remaining lifetime, and reliability are used. Then, a mixed integer nonlinear multi-objective model presented that it simultaneously specifies the period of preventive replacement and the required number of spare parts. This model considers the mentioned criteria and the inventory control costs of spare parts as different objective functions. Since, the solution of the problem depends on the decision maker’s strategy, it need interact with the decision-makers and consequently the proposed model could be solved using goal programming approach. The applicability of the proposed approach is illustrated by two numerical examples. The effect of key parameters on the optimal decisions is investigated for two examples.
topic preventive replacement
spare parts
analytical hierarchy process (ahp)
goal programming
url http://www.ijsom.com/article_2782_1ce09cad2ab5c14aa13d454d106924e0.pdf
work_keys_str_mv AT seyedmehranhoseini amultiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts
AT nasermollaverdi amultiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts
AT srezahejazi amultiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts
AT mohammadtaghirezvan amultiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts
AT seyedmehranhoseini multiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts
AT nasermollaverdi multiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts
AT srezahejazi multiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts
AT mohammadtaghirezvan multiattributeapproachforsimultaneousdeterminationofpreventivereplacementtimesandorderquantityofspareparts
_version_ 1716864969079783424