Research on on-Site Test Method for Flexible HVDC Converter Valve Power Module

[Introduction] In flexible HVDC transmission systems, HVDC converter valve power modules and their spares are tested and maintained at regular intervals. The power modules in good condition are essential to assure the safe and steady operation of flexible HVDC transmission systems. [Method] Firstly...

Full description

Bibliographic Details
Main Authors: CAI Ming, LIN Huan, LIAO Qiyan, MA Guangfu, CHEN Bing
Format: Article
Language:English
Published: Energy Observer Magazine Co., Ltd. 2019-06-01
Series:南方能源建设
Subjects:
Online Access:https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2019.02.013
id doaj-c20228e8a25e4939b4becbf02da8ad0b
record_format Article
spelling doaj-c20228e8a25e4939b4becbf02da8ad0b2021-08-24T03:25:10ZengEnergy Observer Magazine Co., Ltd.南方能源建设2095-86762019-06-0162707610.16516/j.gedi.issn2095-8676.2019.02.013Research on on-Site Test Method for Flexible HVDC Converter Valve Power ModuleCAI Ming0LIN Huan1LIAO Qiyan2MA Guangfu3CHEN Bing4Guangdong Power Grid Co., Ltd., Guangzhou 510663, ChinaGuangdong Power Grid Co., Ltd., Shantou Power Supply Bureau, Shantou 515041, ChinaRongxin Power Electronic Co., Ltd., Anshan 114000, ChinaRongxin Power Electronic Co., Ltd., Anshan 114000, ChinaChina Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou 510663, China)[Introduction] In flexible HVDC transmission systems, HVDC converter valve power modules and their spares are tested and maintained at regular intervals. The power modules in good condition are essential to assure the safe and steady operation of flexible HVDC transmission systems. [Method] Firstly the structure, working mechanism and shop test items of power modules were analyzed in view of the shortage of relevant specifications and standards for power modules on-site test. Then a power module test method suitable for actual situation on site was proposed. Based on the proposed method, a device able to test power modules automatically was developed. [Result] The proposed test method and device effectively improve the completeness, efficiency and accuracy of power module on-site test, which is applied in Sucheng converters station of Nan′ao multi-terminal HVDC flexible system. [Conclusion] The engineering practice indicates that the proposed method provides an effective way for the power module test tasks during the phase of operation, maintenance and inspection, which is close to the actual test situation on site. Moreover, the proposed method and device provide a reference for the power module test tasks of other flexible HVDC transmission systems.https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2019.02.013power moduletest method on sitetest deviceautomatic testing
collection DOAJ
language English
format Article
sources DOAJ
author CAI Ming
LIN Huan
LIAO Qiyan
MA Guangfu
CHEN Bing
spellingShingle CAI Ming
LIN Huan
LIAO Qiyan
MA Guangfu
CHEN Bing
Research on on-Site Test Method for Flexible HVDC Converter Valve Power Module
南方能源建设
power module
test method on site
test device
automatic testing
author_facet CAI Ming
LIN Huan
LIAO Qiyan
MA Guangfu
CHEN Bing
author_sort CAI Ming
title Research on on-Site Test Method for Flexible HVDC Converter Valve Power Module
title_short Research on on-Site Test Method for Flexible HVDC Converter Valve Power Module
title_full Research on on-Site Test Method for Flexible HVDC Converter Valve Power Module
title_fullStr Research on on-Site Test Method for Flexible HVDC Converter Valve Power Module
title_full_unstemmed Research on on-Site Test Method for Flexible HVDC Converter Valve Power Module
title_sort research on on-site test method for flexible hvdc converter valve power module
publisher Energy Observer Magazine Co., Ltd.
series 南方能源建设
issn 2095-8676
publishDate 2019-06-01
description [Introduction] In flexible HVDC transmission systems, HVDC converter valve power modules and their spares are tested and maintained at regular intervals. The power modules in good condition are essential to assure the safe and steady operation of flexible HVDC transmission systems. [Method] Firstly the structure, working mechanism and shop test items of power modules were analyzed in view of the shortage of relevant specifications and standards for power modules on-site test. Then a power module test method suitable for actual situation on site was proposed. Based on the proposed method, a device able to test power modules automatically was developed. [Result] The proposed test method and device effectively improve the completeness, efficiency and accuracy of power module on-site test, which is applied in Sucheng converters station of Nan′ao multi-terminal HVDC flexible system. [Conclusion] The engineering practice indicates that the proposed method provides an effective way for the power module test tasks during the phase of operation, maintenance and inspection, which is close to the actual test situation on site. Moreover, the proposed method and device provide a reference for the power module test tasks of other flexible HVDC transmission systems.
topic power module
test method on site
test device
automatic testing
url https://www.energychina.press/en/article/doi/10.16516/j.gedi.issn2095-8676.2019.02.013
work_keys_str_mv AT caiming researchononsitetestmethodforflexiblehvdcconvertervalvepowermodule
AT linhuan researchononsitetestmethodforflexiblehvdcconvertervalvepowermodule
AT liaoqiyan researchononsitetestmethodforflexiblehvdcconvertervalvepowermodule
AT maguangfu researchononsitetestmethodforflexiblehvdcconvertervalvepowermodule
AT chenbing researchononsitetestmethodforflexiblehvdcconvertervalvepowermodule
_version_ 1721197999195947008