DOES THE MRP LOGIC WORK FOR FINITE CAPACITY PLANNING AND OPERATIONS SCHEDULING?
<p>ENGLISH ABSTRACT: During the past five years, MRP based systems have increasingly been criticized for their inability to reduce inventory levels, meet due dates and to plan at an operational level. This paper suggests that the actual reasons for these problems are some fundamental f...
Main Authors: | V.K Turner, J.C.H. Pauw |
---|---|
Format: | Article |
Language: | English |
Published: |
Stellenbosch University
2012-01-01
|
Series: | South African Journal of Industrial Engineering |
Online Access: | http://sajie.journals.ac.za/pub/article/view/417 |
Similar Items
-
An integrated MRP and JIT production planning and scheduling system
by: Ho, Johnny C.
Published: (2009) -
A comparison of MRP/GT and MRP/JS scheduling
by: Torkul, Orhan
Published: (1993) -
Sources and propagation of schedule volatility in an MRP system
by: Greenwood, David R. (David Richard), 1970-
Published: (2014) -
Feasible master production schedules for MRP systems /
by: Henning, Richard William
Published: (1979) -
Real time MRP with optimisation of manufacturing capacity utilisation
by: Sinulingga, S.
Published: (1988)