EVALUATION OF THE SURFACE SETTLEMENT ABOVE THE PRAGUE METRO LINE A EXTENSION CONSTRUCTED BY TWO SHIELDS
The new section of the Prague metro V.A is located in the west part of Prague, between stations Dejvická and Motol Hospital. The new metro section is 6.2km long and has four new stations. Majority of the two running tunnels that are 6.2km long were excavated by two EPB (Earth Pressure Balance) shiel...
Main Authors: | Matous Hilar, Nhu The Tuan |
---|---|
Format: | Article |
Language: | English |
Published: |
CTU Central Library
2016-12-01
|
Series: | Acta Polytechnica |
Subjects: | |
Online Access: | https://ojs.cvut.cz/ojs/index.php/ap/article/view/3817 |
Similar Items
-
COMPARISON OF ACTUAL GROUND SETTLEMENTS IN TUNNELLING EXCAVATION TO MODEL PREDICTIONS
by: Alexandra Saplachidi, et al.
Published: (2018-02-01) -
Steel Fibre Reinforced Concrete for Tunnel Lining – Verification by Extensive Laboratory Testing and Numerical Modelling
by: Jaroslav Beňo, et al.
Published: (2013-01-01) -
Ground Loss and Static Soil–Structure Interaction during Urban Tunnel Excavation: Evidence from the Excavation of the Athens Metro
by: Villy Kontogianni, et al.
Published: (2020-07-01) -
A HEADRACE TUNNEL RECONSTRUCTION IN TURKEY
by: Matouš Hilar, et al.
Published: (2019-07-01) -
3D FEM Model on the Parameters’ Influence of EPB-TBM on Settlements of Single and Twin Metro Tunnels During Construction
by: Forsat, M., et al.
Published: (2022)