Nature-Inspired Metaheuristics for Two-Agent Scheduling with Due Date and Release Time
This paper delves into a two-agent scheduling problem in which two agents are competing for a single resource. Each agent has a set of jobs to be processed by a single machine. The processing time, release time, weight, and the due dates of each job are known in advance. Both agents have their objec...
Main Authors: | Hongwei Li, Yuvraj Gajpal, Chirag Surti, Dongliang Cai, Amit Kumar Bhardwaj |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi-Wiley
2020-01-01
|
Series: | Complexity |
Online Access: | http://dx.doi.org/10.1155/2020/1385049 |
Similar Items
-
Two-Agent Single Machine Order Acceptance Scheduling Problem to Maximize Net Revenue
by: Jiaji Li, et al.
Published: (2021-01-01) -
Nature-inspired metaheuristic scheduling algorithms in cloud: a systematic review
by: Sandeep Kumar Bothra, et al.
Published: (2021-08-01) -
Solving Integrated Process Planning, Dynamic Scheduling, and Due Date Assignment Using Metaheuristic Algorithms
by: Caner Erden, et al.
Published: (2019-01-01) -
Two-agent scheduling with generalized due dates
by: Myoung-Ju Park, et al.
Published: (2018-12-01) -
Dingo Optimizer: A Nature-Inspired Metaheuristic Approach for Engineering Problems
by: Amit Kumar Bairwa, et al.
Published: (2021-01-01)