Models of resource planning during formation of calendar construction plans for erection of high-rise buildings

This article provides a methodical description of resource-time analysis for a wide range of requirements imposed for resource consumption processes in scheduling tasks during the construction of high-rise buildings and facilities. The core of the proposed approach and is the resource models being d...

Full description

Bibliographic Details
Main Authors: Pocebneva Irina, Belousov Vadim, Fateeva Irina
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:E3S Web of Conferences
Online Access:https://doi.org/10.1051/e3sconf/20183303032
id doaj-bf706ccf0dc645ac91bdd21daceb276c
record_format Article
spelling doaj-bf706ccf0dc645ac91bdd21daceb276c2021-03-02T10:10:44ZengEDP SciencesE3S Web of Conferences2267-12422018-01-01330303210.1051/e3sconf/20183303032e3sconf_hrc2018_03032Models of resource planning during formation of calendar construction plans for erection of high-rise buildingsPocebneva IrinaBelousov VadimFateeva IrinaThis article provides a methodical description of resource-time analysis for a wide range of requirements imposed for resource consumption processes in scheduling tasks during the construction of high-rise buildings and facilities. The core of the proposed approach and is the resource models being determined. The generalized network models are the elements of those models, the amount of which can be too large to carry out the analysis of each element. Therefore, the problem is to approximate the original resource model by simpler time models, when their amount is not very large.https://doi.org/10.1051/e3sconf/20183303032
collection DOAJ
language English
format Article
sources DOAJ
author Pocebneva Irina
Belousov Vadim
Fateeva Irina
spellingShingle Pocebneva Irina
Belousov Vadim
Fateeva Irina
Models of resource planning during formation of calendar construction plans for erection of high-rise buildings
E3S Web of Conferences
author_facet Pocebneva Irina
Belousov Vadim
Fateeva Irina
author_sort Pocebneva Irina
title Models of resource planning during formation of calendar construction plans for erection of high-rise buildings
title_short Models of resource planning during formation of calendar construction plans for erection of high-rise buildings
title_full Models of resource planning during formation of calendar construction plans for erection of high-rise buildings
title_fullStr Models of resource planning during formation of calendar construction plans for erection of high-rise buildings
title_full_unstemmed Models of resource planning during formation of calendar construction plans for erection of high-rise buildings
title_sort models of resource planning during formation of calendar construction plans for erection of high-rise buildings
publisher EDP Sciences
series E3S Web of Conferences
issn 2267-1242
publishDate 2018-01-01
description This article provides a methodical description of resource-time analysis for a wide range of requirements imposed for resource consumption processes in scheduling tasks during the construction of high-rise buildings and facilities. The core of the proposed approach and is the resource models being determined. The generalized network models are the elements of those models, the amount of which can be too large to carry out the analysis of each element. Therefore, the problem is to approximate the original resource model by simpler time models, when their amount is not very large.
url https://doi.org/10.1051/e3sconf/20183303032
work_keys_str_mv AT pocebnevairina modelsofresourceplanningduringformationofcalendarconstructionplansforerectionofhighrisebuildings
AT belousovvadim modelsofresourceplanningduringformationofcalendarconstructionplansforerectionofhighrisebuildings
AT fateevairina modelsofresourceplanningduringformationofcalendarconstructionplansforerectionofhighrisebuildings
_version_ 1724237538178105344