Equipment for Quantitative Assessment of Control System Performance Using Pseudo-Random Binary Signals

The reasons for requiring an accurate prediction of control system performance under actual operating conditions are discussed. It is shown that a measure of the integral square error in response to a stationary time series disturbance meets most requirements. The analytical approach to calculating...

Full description

Bibliographic Details
Main Authors: M. S. Beck MSc, CEng, MIEE, F. M. Dadachanji MSc.
Format: Article
Language:English
Published: SAGE Publishing 1968-07-01
Series:Measurement + Control
Online Access:https://doi.org/10.1177/002029406800100704

Similar Items