The analysis of the possibility of using 10-minute rainfall series to determine the maximum rainfall amount with 5 minutes duration
Modern scientific research in the area of heavy rainfall analysis regarding to the sewerage design indicates the need to develop and use probabilistic rain models. One of the issues that remains to be resolved is the length of the shortest amount of rain to be analyzed. It is commonly believed that...
Main Authors: | Kaźmierczak Bartosz, Wartalska Katarzyna, Wdowikowski Marcin, Kotowski Andrzej |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2017-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://doi.org/10.1051/e3sconf/20172200079 |
Similar Items
Faculty Senate Minutes September 10, 2012
by: University of Arizona Faculty Senate
Published: (2012)
by: University of Arizona Faculty Senate
Published: (2012)
Similar Items
-
Probabilistic approach in the heavy rainfall modelling – is model verification needed?
by: Wdowikowski Marcin, et al.
Published: (2018-01-01) -
The impact of the time series resolution on the reliability of the maximum precipitation models
by: Kaźmierczak Bartosz, et al.
Published: (2017-01-01) -
Probabilistic approach of the Upper and Middle Odra basin daily rainfall modeling
by: Wdowikowski Marcin, et al.
Published: (2017-01-01) -
Model Hyetographs of Short-Term Rainfall for Wrocław in the Perspective of 2050
by: Katarzyna Wartalska, et al.
Published: (2020-06-01) -
Temporal Analysis of Daily and 10 Minutes of Rainfall of Poprad Station in Eastern Slovakia
by: Adam Repel, et al.
Published: (2020-06-01)